Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 489.88 158.32 32.32  
1 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation Augmentation of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) within Barjora Block under Bankura Sadar Sub-Division of Bankura Division, PHE Dte. (Zone-IA) Block - Barjora, Assistant Engineer Junior Engineer ORD/000336/2023-2024 1960/BQA 18/07/2023 270 PRINCE INDUTRIES (INDIA) 352.95 157.41 44.6 80
2 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation FHTC (Functional House Hold Tap Connection') in SCHOOL, ICDS & House hold in connection with Jal Jeevan Mission (JJM) for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase- I) within Barjor under Bankura Sadar Sub- Division of Bankura Division, PHE Dte. (Zone- IA). No. of Mouza :- 01 nos., (Tikargram), No. of Household- 08 nos. Assistant Engineer Junior Engineer ORD/001043/2023-2024 1165/BSD 22/11/2023 15 SAMIRUDDIN KHAN 0.92 0.91 98.91 100
3 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation UPVC Pipe line inter connection From Lagardanga to Tikargram village of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase- I) within Barjora Block under Bankura Sadar Sub-Division of Bankura Division, PHE Dte. (Zone- IA) Assistant Engineer Junior Engineer ORD/001075/2023-2024 1163\BSD 22/11/2023 195 AMIR UDDIN KHAN 0.92 0.00 0 100
4 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation Support service for detail surveying, cross checking of available LOP and taking level at the interval of 50 mtr. by using survey instrument like DGPS / Drone and detailed design of pipeline by using Watergems Software on the basis of population density for Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). under Bankura Sadar Sub Division of Bankura Division, PHE Dte. Assistant Engineer ORD/001184/2023-2024 436/BQA 08/02/2024 30 LEMNISCATE 2.77 0.00 0 0
5 BANKURA Bankura Division Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation Material Requisition To Resource Division RTOR000089/2023-2024 2732/BQA 03/10/2023 Resource Division 4.00 0.00 0 0
6 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). BILL/00154/2023-2024 null 28/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.00 0.00 0 0
7 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation WBSEDCL, Quotation Bill for new power connection at Sahebdanga Pump House augmentation work under Barjora (Left out Mouza) (zone-IA ) water supply scheme (SM/16974) BILL/00723/2024-2025 null 21/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 5.63 0.00 0 null
8 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation Acceptance cum Formal work order for the work of Providing and installation of Boosting pumping machineries and other electromechanical accessories at Tail End site for Augmentation work for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase-I) (Zone-IA) under Bankura Mechanical Division, P.H.E. Dte Assistant Engineer Junior Engineer ORD/000337/2024-2025 519/BMD 09/07/2024 120 SINHA ELECTRICALS 11.28 0.00 0 0
9 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation Acceptance cum Formal work order for the work of Providing and installation of High lift & Low Lift pumping machineries and other electro mechanical accessories for Augmentation work for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase-I)( Zone-IA) under Bankura Mechanical Division, PHED. Assistant Engineer Junior Engineer ORD/000454/2023-2024 1780/BMD 01/08/2023 120 SUNRISE ENGINEERING CORPORATION 81.75 0.00 0 0
10 BANKURA Bankura Mechanical Augmentation works for BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-IA). , SM/16974 Augmentation Acceptance cum Formal work order for the work of Providing and installation of MCC cum PDB and other electromechanical accessories for source Augmentation works for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase I) (Zone IA) At Damodhar River Bank site under Bankura Mechanical Division, P.H.E. Dte Assistant Engineer Junior Engineer ORD/001034/2023-2024 2966/BMD 29/02/2024 180 TAPAN KUMAR SARKAR 28.66 0.00 0 0
Total 489.89 158.33 32.32