Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 11,307.9 5.28 0.05  
1 BANKURA Indus,Kotulpur Bankura Division Patrabandh Piped Water Supply Scheme , SM/14012 New Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Kotulpur Block under Bishnupur Sub-Division under Bankura Division, PHE Dte.. Assistant Engineer ORD/000220/2022-2023 1118/BQA 18/05/2022 60 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 153.30 5.28 3.44 100
2 BANKURA Indus,Kotulpur Bankura Division Patrabandh Piped Water Supply Scheme , SM/14012 New SUPPLY, DELIVERY, CONSTRUCTION, COMMISSIONING AND COMPLETION OF ALL CIVIL & ELECTRO MECHANICAL WORKS INCLUDING ALL ALLIED, RELATED AND ENABLING WORKS FOR GHAGARA, KATABAN, BASANTAPUR, HETIA, ROUTHKHANDA, HIRAPUR, NABASAN, BANNA, PANKHAI, MADHABBATI & MAKARANDAPUR PIPED WATER SUPPLY SCHEME OF JOYPUR BLOCK AND KARAKBERYA, KHIRI, LAUGRAM & PATRABANDH PIPED WATER SUPPLY SCHEME OF KOTULPUR BLOCK , DIST- BANKURA UNDER JJM INCLUDING TRIAL RUN FOR 3 MONTHS AND O&M FOR A PERIOD OF 3 YEARS UNDER BANKURA DIVISION,PHE Dte. Assistant Engineer Junior Engineer ORD/000362/2023-2024 2025/BQA 24/07/2023 526 MACKINTOSH BURN LIMITED 11,091.12 0.00 0 6
3 BANKURA Indus,Kotulpur Bankura Division Patrabandh Piped Water Supply Scheme , SM/14012 New Material Requisition To Resource Division RTOR000065/2022-2023 79BQA 06/01/2023 Resource Division 57.78 0.00 0 0
4 BANKURA Indus,Kotulpur Bankura Mechanical Patrabandh Piped Water Supply Scheme , SM/14012 New New service connection at P/H-I at Patrabandh W/S scheme BILL/00420/2024-2025 BP-2024-25-100 21/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 5.70 0.00 0 null
Total 11,307.91 5.28 0.05