Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 291.43 68.94 23.66  
1 BANKURA Bankura Division Augmentation of piped water supply schemes for Bikna and its adjoining mouzas , SM/09879 Augmentation Payment to Rail BILL/00020/2023-2024 FHTC/17 17/04/2023 SOUTH EASTERN RAILWAY 5.87 0.00 0 0
2 BANKURA Bankura Division Augmentation of piped water supply schemes for Bikna and its adjoining mouzas , SM/09879 Augmentation Laying DI (K7) & UPVC pipe line for distribution system & Construction and commissioning of 300 m³ capacity R.C.C OHR (based on Departmental Design Ref. Drawing No. PC- 1/OHR/7/2012 (Sheet 1 &2)with 20 mtr staging height including foundation, pipeline connection and cost of pipes , specials etc.and allied works for the proposed Augmentation of piped water supply scheme for Bikna and its adjoining mouzas under Bankura Sadar Sub- Division of Bankura Division P.H.E. Dte. Block-Bankura -II , District -Bankura PART -A and Construction and commissioning of 300 m³ capacity R.C.C OHR (based on Departmental Design Ref. Drawing No. PC- 1/OHR/7/2012 (Sheet 1 &2)with 20 mtr staging height including foundation, pipeline connection and cost of pipes , specials etc.and allied works for the proposed Augmentation of piped water supply scheme for Bikna and its adjoining mouzas under Bankura Sadar Sub- Division of Bankura Division P.H.E. Dte. Block-Bankura -II , District -Bankura PART - B Assistant Engineer Junior Engineer ORD/000077/2022-2023 1989/BQA 27/09/2022 270 PARAMESWAR CHOWDHURY 193.56 49.22 25.43 0
3 BANKURA Bankura Division Augmentation of piped water supply schemes for Bikna and its adjoining mouzas , SM/09879 Augmentation Survey work for Augmentation for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) for 03 nos. Mouzas of proposed Augmentation of piped water supply scheme for Bikna and its adjoining mouzas under Bankura Sadar Sub- Division of Bankura Division P.H.E. Dte. Block-Bankura -II , District -Bankura. Block - Bankura- II, Name of OHR - Bikna Water Supply Scheme, No. of Mouza :- 03 nos, Bikna (235), Kuraria (254), Katnar (255). Assistant Engineer Junior Engineer ORD/000272/2023-2024 519/BSD 12/06/2023 60 TAPAS DEY 0.45 0.00 0 100
4 BANKURA Bankura Division Augmentation of piped water supply schemes for Bikna and its adjoining mouzas , SM/09879 Augmentation Laying Rising Main DI (K9) pipe & construction of CWR (50 CUM CAPACITY) with plinth protection for the proposed Augmentation of piped water supply scheme for Bikna and its adjoining mouzas under Bankura Sadar Sub- Division of Bankura Division P.H.E. Dte. Block-Bankura -II , District -Bankura ( Single compartment , Size of Compartment -Length 5mtr , Width-5mtr , Depth -2.5 mtr ) ( Sl.No-04) Assistant Engineer Junior Engineer ORD/000445/2021-2022 525/BQA 10/03/2022 315 SAIKAT CHOWDHURY 13.71 3.35 24.43 51
5 BANKURA Bankura Division Augmentation of piped water supply schemes for Bikna and its adjoining mouzas , SM/09879 Augmentation Soil Investigation work for Construction and commissioning of R.C.C Over Head Reservoir of capacity 300 cum and staging height 20 mtr for Augmentation of piped water supply scheme for Bikna and its adjoining mouzas (JJM REVISION) under Bankura Sadar Sub- Division of Bankura Division P.H.E. Dte. Assistant Engineer ORD/001070/2022-2023 359/BSD 13/04/2022 15 ASIS ENTERPRISE 1.85 1.73 93.51 100
6 BANKURA Bankura Division Augmentation of piped water supply schemes for Bikna and its adjoining mouzas , SM/09879 Augmentation Road Crossing work by verious dia MS carrier pipe by Jack pushing method, inetrconnection of MS carrier pipe with UPVC pipeline including fabrication of MS pipe & allied works for Augmentation of Bikna Piped Water Supply Scheme (JJM Revision) under Bankura Sadar Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001266/2023-2024 693/BQA 28/02/2024 45 PARAMESWAR CHOWDHURY 34.80 14.64 42.07 85
7 BANKURA Bankura Mechanical Augmentation of piped water supply schemes for Bikna and its adjoining mouzas , SM/09879 Augmentation Acceptance cum Formal work order for the work of Providing and installation of gaseous chlorination system and other electromechanical acessories at OHR site of Augmentation works for Bikna and its adjoining mouzas Water Supply Scheme (Phase- I). under Bankura Mechanical Division, P.H.E. Dte Assistant Engineer Junior Engineer ORD/000319/2024-2025 860/BMD 29/08/2024 120 PROGRESSIVE ENGINEERS CO-OPERATIVE SOCIETY LIMITED 41.19 0.00 0 0
Total 291.43 68.94 23.66