Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 123.52 5.4 4.37  
1 HOOGHLY Hooghly Division Source Augmentation of PABA Piped Water Supply Scheme under Goghat-II Block , SM/18963 Augmentation Sinking of 5 nos. 300 X200 mm dia Tube Well 240 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at PABA (1 NO.),BAIKUNTHAPUR (2Nos.),SAOTA (2Nos.) W/S Scheme under ARAMBAGH Sub-Division of Hooghly Division, P.H.E. Dte.(SOURCE AUGMENTATION) Assistant Engineer Junior Engineer (Civill) ORD/000645/2023-2024 3475/HUG 29/11/2023 45 CIVIL CRAFT 88.67 0.00 0 0
2 HOOGHLY Hooghly Division Source Augmentation of PABA Piped Water Supply Scheme under Goghat-II Block , SM/18963 Augmentation Connection of T.W. No. III with distribution, Construction of 5.4 x 3.65 m Pump Room with Sanitary arrangement and Boundary Wall at PABA Piped Water Supply Scheme under Arambagh Sub-Division Of Hooghly Division P.H.E Dte. Assistant Engineer Junior Engineer (Civill) ORD/000649/2023-2024 3482/HUG 29/11/2023 60 DHIRENDRA ENGINEERING & CONSTRUCTION 23.74 0.00 0 100
3 HOOGHLY Electrical Source Augmentation of PABA Piped Water Supply Scheme under Goghat-II Block , SM/18963 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Paba water supply scheme, T.W. No. III, Block: Goghat-II, District - Hooghly under Electrical Division, PHE Dte. Assistant Engineer 2 Junior Engineer4 ORD/002575/2022-2023 2046/ED 01/12/2022 90 M/S G P ENTERPRISE 11.11 5.40 48.6 30
Total 123.52 5.40 4.37