Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 146.45 13.16 8.99  
1 HOOGHLY Hooghly Division Source Augmentation Of BAIKUNTHAPUR piped Water Supply Scheme under Pursurah Block , SM/18961 Augmentation Sinking of 5 nos. 300 X200 mm dia Tube Well 240 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at PABA (1 NO.),BAIKUNTHAPUR (2Nos.),SAOTA (2Nos.) W/S Scheme under ARAMBAGH Sub-Division of Hooghly Division, P.H.E. Dte.(SOURCE AUGMENTATION) Assistant Engineer Junior Engineer (Civill) ORD/000645/2023-2024 3475/HUG 29/11/2023 45 CIVIL CRAFT 88.67 13.16 14.84 0
2 HOOGHLY Hooghly Division Source Augmentation Of BAIKUNTHAPUR piped Water Supply Scheme under Pursurah Block , SM/18961 Augmentation Construction of 3 Nos. 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, 3 Nos. Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between 3 Nos. T.W & Distribution at BAIKUNTHAPUR (1Nos.), SAOTA (2Nos.) W/S Scheme under ARAMBAGH Sub-Division of Hooghly Division, P.H.E. Dte. (SOURCE AUGMENTATION) ORD/000716/2023-2024 3352/HUG 17/11/2023 60 A.R. CONSTRUCTION 35.75 0.00 0 0
3 HOOGHLY Electrical Source Augmentation Of BAIKUNTHAPUR piped Water Supply Scheme under Pursurah Block , SM/18961 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Source Augmentation Of BAIKUNTHAPUR piped Water Supply Scheme Block- Pursura District- Hooghly under JJM Program under Electrical Division PHE Dte. ORD/001290/2023-2024 4522/ED 23/11/2023 90 TRIDENT ENTERPRISE 22.03 0.00 0 0
Total 146.45 13.16 8.99