Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 1,002.83 56.98 5.68  
1 HOOGHLY Hooghly Division Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Augmentation of DIHIBATPUR Piped Water Supply Scheme with Sinking of 3 Nos. Tube Well within ZONE-I & II, Construction of 300 cum capacity RCC OHR in ZONE-I & Construction of 250 cum capacity RCC OHR in ZONE-II with 20.0 mtr. Staging height including soil investigation, Repairing of Existing Switch Rooms, Boundary walls at different TW site, LDS, Rising Main, FHTC, construction of 1 No. switch-room & boundary wall in ZONE-I & construction of 2 Nos. switch-room & 3 nos boundary wall , LDS, Rising Main, FHTC in ZONE-II under PURSURAH Block, District:- Hooghly Assistant Engineer Junior Engineer (Civill) ORD/000288/2023-2024 2340/HUG 07/08/2023 270 CONCORD ENGINEERING (ASOKE KUMAR DHAR) 869.52 56.98 6.55 20
2 HOOGHLY Hooghly Division Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of DIHIBATPUR (ZONE-I) Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.HE Dte. ORD/000807/2023-2024 597/HUG 22/02/2024 60 AMBIAN INFRASTRUCTURE 29.67 0.00 0 0
3 HOOGHLY Hooghly Division Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of SOALUK Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.HE Dte. Assistant Engineer ORD/000814/2023-2024 593/HUG 22/02/2024 60 SURAJIT SINGHA RAY 31.57 0.00 0 0
4 HOOGHLY Electrical Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Electric quot. of WBSEDCL for New service Connection of Dihibatpur T/W-VI W/S scheme under Electrical Division PHE Dte. (SM/18670) BILL/01615/2024-2025 373 12/08/2024 WBSEDCL 6.98 0.00 0 null
5 HOOGHLY Electrical Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for SAIDPUR PIPED W/S SCHEME, T.W. No. VI, Block: Pursurah, District - Hooghly under JJM Program under Electrical Division PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer1 ORD/000159/2024-2025 1182/ED 14/06/2024 90 M/S CHANDIMATA ELECTRICALS 10.73 0.00 0 0
6 HOOGHLY Electrical Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for SAIDPUR PIPED W/S SCHEME, T.W. No. VII, Block: Pursurah, District - Hooghly under JJM Program under Electrical Division PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer1 ORD/000160/2024-2025 1183/ED 14/06/2024 90 STANDARD ELECTRICALS 10.75 0.00 0 0
7 HOOGHLY Electrical Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Dihibatpur water supply scheme, T.W. No.- I, II & III, Block: Pursurah, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer1 ORD/000843/2023-2024 3411/ED 10/08/2023 90 B.T. PROJECT PVT. LTD. 32.89 0.00 0 0
8 HOOGHLY Electrical Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly , SM/18670 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Dihibatpur water supply scheme, T.W. No. IV, Block: Pursurah, District: Hooghly under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer1 ORD/002469/2023-2024 330/ED 21/02/2024 90 AMIT DAS 10.72 0.00 0 0
Total 1,002.83 56.98 5.68