Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 830.71 123.71 14.89  
1 HOOGHLY Hooghly Division Augmentation of Shyampur Piped Water Supply Scheme, Block- Pursura, District-Hooghly. , SM/18347 Augmentation Augmentation of SHYAMPUR Piped Water Supply Scheme with Sinking of 3 Nos. tube-well within ZONE-I, II & III, Repairing of Existing O.H.R, Switch Rooms, Boundary walls at different TW site, LDS, FHTC in ZONE-I, LDS, FHTC, construction of switch-rooms & boundary walls in ZONE-II, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & LDS, RISING MAIN, FHTC, construction of switch-rooms & boundary walls in ZONE-III under PURSURAH Block, District:- Hooghly Assistant Engineer Junior Engineer (Civill) ORD/000275/2023-2024 2292/HUG 03/08/2023 270 SIBSANKAR CHOWDHURY 745.98 123.71 16.58 45
2 HOOGHLY Electrical Augmentation of Shyampur Piped Water Supply Scheme, Block- Pursura, District-Hooghly. , SM/18347 Augmentation Electric quot. of WBSEDCL for New Connection of Shyampur T/W-IV W/S scheme under ED PHE Dte (SM/18347) BILL/01356/2024-2025 338 30/07/2024 WBSEDCL 4.57 0.00 0 null
3 HOOGHLY Electrical Augmentation of Shyampur Piped Water Supply Scheme, Block- Pursura, District-Hooghly. , SM/18347 Augmentation Electric quot. of WBSEDCL for New service Connection of Shyampur T/W-III W/S scheme under Electrical Division PHE Dte. (SM/18347) BILL/01613/2024-2025 372 12/08/2024 WBSEDCL 26.41 0.00 0 null
4 HOOGHLY Electrical Augmentation of Shyampur Piped Water Supply Scheme, Block- Pursura, District-Hooghly. , SM/18347 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for SHYAMPUR PIPED W/S SCHEME, T.W. No. V, Block: Pursurah, District - Hooghly under JJM Program under Electrical Division PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer1 ORD/000165/2024-2025 1187/ED 14/06/2024 90 COOLING CARE CENTER 10.74 0.00 0 0
5 HOOGHLY Electrical Augmentation of Shyampur Piped Water Supply Scheme, Block- Pursura, District-Hooghly. , SM/18347 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Shyampur water supply scheme, T.W. No.- I, II, III & IV, Block: Pursurah, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer 2 Junior Engineer1 ORD/000820/2023-2024 3174/ED 28/07/2023 90 H.K.DAS & CO. 43.01 0.00 0 1
Total 830.71 123.71 14.89