Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 1,028.85 293.3 28.51  
1 HOOGHLY Singur Hooghly Division NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Sinking of 5 nos. 300 X200 mm dia Tube Well 210 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at ATISARA, NANDA, NAWPARA,BASUBATI & ASTARA W/S Scheme underChandannagar Sub-Division of Hooghly Division, P.H.E. Dte.. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000203/2023-2024 1818/HUG 22/06/2023 45 OSMAN SEKH 80.85 0.00 0 100
2 HOOGHLY Singur Hooghly Division NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Construction of 400 cum capacity OHR with 20 mtr. staging height including Soil Investigation work, Laying Distribution System, Rising Main & Interconnection between O.H.R, TW No-I & II, Construction of 1 No 5.4M X 3.6M Switch Room with Sanitary and Water Supply Arrangements & Boundary Wall at Head Work Site, Construction of 1 No 3.6M x 3.0M Switch Room with Sanitary & Water Supply arrangement & Boundary Wall at 2nd T/W Site including Providing FHTC in NAWPARA Water Supply Scheme at SINGUR Block under Chandannagar Sub- Division, PHE Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000274/2023-2024 2294/HUG 03/08/2023 300 DIPTI TRADERS 757.77 282.45 37.27 60
3 HOOGHLY Singur Hooghly Division NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Sinking of Five Nos. Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto180 Mtr at ATISARA, NANDA, NOWPARA, BASUBATI & ASTARA PWSS of CHANDANNAGAR Sub-Division under Hooghly Division, PHE Dte. Assistant Engineer (Civil) ORD/000784/2022-2023 878/HUG 27/03/2023 45 MS D.PALIT AND CO. 62.24 0.00 0 100
4 HOOGHLY Singur Hooghly Division NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Material Requisition To Resource Division RTOR000156/2022-2023 01/03/Hug 02/01/2023 Resource Division 18.04 0.00 0 0
5 HOOGHLY Singur Hooghly Division NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Material Requisition To Resource Division RTOR000194/2022-2023 109/4/Hug 10/01/2023 Resource Division 52.00 0.00 0 0
6 HOOGHLY Singur Hooghly Division NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Material Requisition To Resource Division RTOR000390/2023-2024 3058/6/Hug 11/10/2023 Resource Division 17.71 0.00 0 0
7 HOOGHLY Singur Electrical NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Quotation for service connection for Nawpara W/S Sch. , T/W -I, Block - Singur BILL/02064/2023-2024 111 19/07/2023 WBSEDCL 2.63 0.00 0 0
8 HOOGHLY Singur Electrical NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Quotation Bill for New Service Connection at Nawpara W/S. Sch. TW-II BILL/04503/2023-2024 547 19/12/2023 WBSEDCL 15.90 0.00 0 0
9 HOOGHLY Singur Electrical NAWPARA PIPED WATER SUPPLY SCHEME , SM/18241 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Nawpara water supply scheme, T.W. No. I & II, Block: Singur, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer 2 Junior Engineer4 ORD/000810/2023-2024 3063/ED 12/07/2023 90 POLYCON ENGINEERS 21.71 10.85 49.98 92
Total 1,028.85 293.29 28.51