Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 200.59 31.19 15.55  
1 HOOGHLY Hooghly Division Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed 2 nos. T.W with distribution system, For Development of BORHAL (ZONE-I)W/S Scheme under Serampore Sub - Division P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000111/2023-2024 1440/HUG 18/05/2023 45 CITYCON UNEMPLOYED ENGINEERS CO-OP SOCIETY LTD 31.23 4.35 13.93 25
2 HOOGHLY Electrical Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Quotation money deposition for new service connection at Borhal w/s scheme, T.W. No.-IV, Dist.-Hooghly under PHE Dte. Application No- 5004065635 Reference ID- 503592946 SM Code- 16449 BILL/00487/2024-2025 146 22/05/2024 WBSEDCL 4.57 0.00 0 null
3 HOOGHLY Electrical Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Adhoc payment to WBSEDCL against Service Connection BILL/01125/2023-2024 null 28/06/2023 WBSEDCL 71.17 0.00 0 0
4 HOOGHLY Electrical Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Borhal Z-I P H NO-3 BILL/02294/2023-2024 145 26/07/2023 WBSEDCL 4.55 0.00 0 0
5 HOOGHLY Electrical Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Borhal (Zone-I) water supply scheme, T.W. No. I & II, Block: Jangipara, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer 1 Junior Engineer2 ORD/000015/2023-2024 1631/ED 11/04/2023 90 S.S. ENTERPRISES 23.30 5.68 24.38 85
6 HOOGHLY Electrical Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Source Augmentation of BORHAL Piped Water Supply Scheme Block- Jangipara District- Hooghly under JJM Program under Electrical Division PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/002466/2023-2024 327/ED 21/02/2024 90 DEY ENTERPRISE 20.85 0.00 0 0
7 HOOGHLY Electrical Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for MORHAL PIPED W/S SCHEME, T.W. No. IV, District - Hooghly under JJM Program under Electrical Division PHE Dte. Assistant Engineer 1,Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/002882/2023-2024 457/ED 05/03/2024 90 D. K. ELECTRIC 9.70 0.00 0 65
8 HOOGHLY Central Drilling Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Providing Drilling crew and other allied works for construction of Tube well (300mm x 200mm x 150 mtrs. Depth) by utilising Departmental machineries for Borhal W/S Scheme (Z-I), Jangipara block under hooghly District, CDD PHE Dte. Driller In Charge Junior Engineer ORD/000457/2022-2023 2330/CDD 30/03/2023 30 C.M. ENTERPRISE 22.68 10.58 46.65 47
9 HOOGHLY Central Drilling Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se , SM/16449 Augmentation Providing Drilling crew and other allied works for construction of Tube well (300mm x 200mm x 180 mtrs. Depth) by utilising Departmental machineries for Borhal W/S Scheme (Z-I, TW-I), Jangipara block under hooghly District, CDD PHE Dte. Driller In Charge Junior Engineer ORD/000458/2022-2023 1995/CDD 07/02/2023 30 UTTAM KUMAR CHATTERJEE 12.54 10.58 84.37 100
Total 200.59 31.19 15.55