Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 124.83 26.78 21.45  
1 HOOGHLY Hooghly Division Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric , SM/15898 Augmentation Construction of 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed T.W. with distribution system & FHTC For Development of ANIYA W/S Scheme under Serampore Sub - Division P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000113/2023-2024 1442/HUG 18/05/2023 30 M/S KAMALA ENTERPRISE 26.42 10.48 39.67 80
2 HOOGHLY Hooghly Division Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric , SM/15898 Augmentation Material Requisition To Resource Division RTOR000311/2023-2024 1384/8/Hug 16/05/2023 Resource Division 1.23 0.00 0 0
3 HOOGHLY Electrical Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric , SM/15898 Augmentation Adhoc payment to WBSEDCL against Service Connection BILL/01125/2023-2024 null 28/06/2023 WBSEDCL 71.17 0.00 0 0
4 HOOGHLY Electrical Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric , SM/15898 Augmentation Aniya water supply scheme,P H No-3 BILL/02293/2023-2024 142 25/07/2023 WBSEDCL 3.20 0.00 0 0
5 HOOGHLY Electrical Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric , SM/15898 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Aniya water supply scheme, T.W. No. I, Block: Chanditala-I, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer 1 Junior Engineer2 ORD/000011/2023-2024 1627/ED 11/04/2023 90 ANIK & CO. 11.41 5.55 48.64 85
6 HOOGHLY Central Drilling Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric , SM/15898 Augmentation PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (300MM X 200MM X 150 MTRS.) BY UTILISING DEPARTMENTAL RIG MACHINERIES FOR ANIYA SCHEME (P/H-3), CHANDITALA-I BLOCK UNDER HOOGHLY DISTRICT, CENTRAL DRILLING DIVISION , PHE DTE. Driller In Charge Junior Engineer ORD/000032/2023-2024 872/CDD 11/07/2023 30 UTTAM KUMAR CHATTERJEE 10.73 10.41 97.02 100
7 HOOGHLY Central Drilling Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric , SM/15898 Augmentation Additional work for construction of tube well at Aniya PWSS TW-I, Chanditala-I Block, Hooghly District by utilizing skilled departmental crew and departmental mechaneries CDD, PHE Dte. Driller In Charge Junior Engineer ORD/000197/2023-2024 193/CMSD-II 26/07/2023 10 UTTAM KUMAR CHATTERJEE 0.67 0.34 50.75 100
Total 124.83 26.79 21.46