Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 112.26 0 0  
1 HOOGHLY Hooghly Division Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly , SM/15793 Augmentation Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of Santoshpur Piped Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.HE Dte. within Tarakeswar Block. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000078/2023-2024 1312/HUG 10/05/2023 30 SRI KRISHNA ENTERPRISE 11.78 0.00 0 0
2 HOOGHLY Hooghly Division Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly , SM/15793 Augmentation Sinking of One No Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto180 Mtr at SANTOSHPUR PWSS of CHANDANNAGAR Sub-Division under Hooghly Division, PHE Dte. Assistant Engineer (Civil) ORD/000768/2022-2023 751/HUG 15/03/2023 30 PAUL CONSTRUCTION (RANJIT KUMAR PAUL) 12.44 0.00 0 0
3 HOOGHLY Electrical Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly , SM/15793 Augmentation Quotation money deposition for new service connection at Santoshpur w/s scheme, P.H. No.-3, Dist.-Hooghly under PHE Dte. Application No- 5004085290 Reference ID- 503609191 SM Code- 15793 BILL/00439/2024-2025 129 17/05/2024 WBSEDCL 6.12 0.00 0 null
4 HOOGHLY Electrical Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly , SM/15793 Augmentation Adhoc payment to WBSEDCL against Service Connection BILL/01125/2023-2024 null 28/06/2023 WBSEDCL 71.17 0.00 0 0
5 HOOGHLY Electrical Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly , SM/15793 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Santoshpur water supply scheme, T.W. No. I, Block: Tarakeswar, District- Hooghly under Electrical Division, PHE Dte. ORD/000007/2023-2024 1623/ED 11/04/2023 90 UNIVERSAL ENTERPRISES 10.75 0.00 0 0
Total 112.25 0.00 0