Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 602.23 194.84 32.35  
1 HOOGHLY Chanditala - II Hooghly Division MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New CONSTRUCTION OF 2Nos. TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL AT MADHABPUR HW SITE AND KUMIRMORA Z-I 2ND TW SITE UNDER SERAMPORE SUB-DIVISION OF HOOGHLY DIVISION P.H.E DTE. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000147/2024-2025 430/SER 31/07/2024 15 SUNITI MAIRA 0.68 0.00 0 95
2 HOOGHLY Chanditala - II Hooghly Division MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Madhabpur Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under CHANDITALA-II Block, District:- Hooghly. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000690/2022-2023 326/HUG 03/02/2023 270 ARUN SEAL AND CO. 443.64 186.31 42 50
3 HOOGHLY Chanditala - II Hooghly Division MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Material Requisition To Resource Division RTOR000317/2023-2024 1384/14/Hug 15/05/2023 Resource Division 11.08 0.00 0 0
4 HOOGHLY Chanditala - II Hooghly Division MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Material Requisition To Resource Division RTOR000494/2023-2024 3060/12/Hug 11/10/2023 Resource Division 11.08 0.00 0 0
5 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Adhoc Payment to WBSEDCL against Service Connection BILL/01124/2023-2024 null 28/06/2023 WBSEDCL 89.37 0.00 0 0
6 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Madhavpur w/s scheme,P H No 1 BILL/03774/2023-2024 273 08/09/2023 WBSEDCL 3.71 0.00 0 0
7 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Madhavpur w/s scheme,P H No 2 BILL/04511/2023-2024 554 21/12/2023 WBSEDCL 6.73 0.00 0 0
8 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Madhabpur water supply scheme TW No I and II Block Chanditala II District Hooghly under ED PHED. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/000231/2022-2023 862/ED 14/02/2023 90 NEW RANBEE ENGINEERING 20.36 8.53 41.9 40
9 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Rectification & overhualing of VCB Panel, LT Panel, ATS Panel, AVR and transformer at BS-I, Madhabpur under (N) 24 Pgs. Arsenic Area W/S. Sch. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/001207/2021-2022 145/AE-I/ED 18/02/2022 90 ORIENTAL ENGINEERING CO. 1.90 0.00 0 0
10 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Supply & Installation of NRV and other allied works at BS-I, Madhabpur under (N) 24 Pgs. Arsenic Area W/S. Sch. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/001208/2021-2022 1009/AE-I/ED 13/08/2021 90 ORIENTAL ENGINEERING CO. 4.56 0.00 0 0
11 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Supply & Installation of Butterfly valve for pump set no-2 at BS-I, Madhabpur under (N) 24 Pgs. Arsenic Area W/S. Sch. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/001210/2021-2022 42/AE-I/ED 14/01/2022 90 ORIENTAL ENGINEERING CO. 4.56 0.00 0 0
12 HOOGHLY Chanditala - II Electrical MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. , SM/13347 New Supply & Installation of Butterfly valve & Check valve for pump set no-3 at BS-I, Madhabpur under (N) 24 Pgs. Arsenic Area W/S. Sch. Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/001211/2021-2022 43/AE-I/ED 14/01/2022 90 ORIENTAL ENGINEERING CO. 4.56 0.00 0 0
Total 602.21 194.84 32.35