Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
19 958.65 588.76 61.42  
1 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation PAYMENT TO ELECTRICAL DIVISION, PHE DTE.FOR THE PAYMENT TO WBSEDCL BILL/00490/2023-2024 BP-2023-24-390 19/09/2023 EXECUTIVE ENGINEER, ELECTRICAL DIVISION, PHE DTE 3.90 0.00 0 0
2 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation PAYMENT TO EXECUTIVE ENGINEER,ELECTRICAL DIVISION, PHE DTE. FOR WBSEDCL AT MALAYPUR WATER SUPPLY SCHEME. BILL/00534/2023-2024 BP-2023-24-438 06/10/2023 EXECUTIVE ENGINEER, ELECTRICAL DIVISION, PHE DTE 4.78 0.00 0 0
3 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Laying Rising Main & interconnection of T.W. No.-I, II & III for AUGMENTATION of MALAYPUR Piped Water Supply Scheme under Arambagh Sub-Division Of Hooghly Division P.H.E Dte. Block-Arambagh, District:- Hooghly [AUGMENTATION SCHEME] Assistant Engineer Junior Engineer (Civill) ORD/000121/2023-2024 1455/HUG 18/05/2023 30 M/S PRADYUT KUMAR HAZRA 7.82 0.00 0 0
4 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply & Sanitation arrangement, Boundary Wall in Proposed T.W1 Site, Laying rising main pipe for inter connection between T.W & Distribution For Augmentation of MALAYPUR Piped Water Supply Scheme under Arambagh Sub-Division of Hooghly Division P.HE Dte. within Arambagh Block. Assistant Engineer Junior Engineer (Civill) ORD/000122/2023-2024 1456/HUG 18/05/2023 30 HAZRA CONSTRUCTION 10.24 0.00 0 70
5 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply & Sanitation arrangement , Boundary Wall in Proposed T.W2 Site, Laying rising main pipe for inter connection between T.W & Distribution For Augmentation of MALAYPUR Piped Water Supply Scheme under Arambagh Sub-Division of Hooghly Division P.HE Dte. within Arambagh Block. Assistant Engineer Junior Engineer (Civill) ORD/000127/2023-2024 1457/HUG 18/05/2023 30 HAZRA CONSTRUCTION 10.23 0.00 0 70
6 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Preparation of DPR for Augmentation of MALAYPUR Piped Water Supply Scheme Under Arambagh Sub-Division of Hooghly Division P.H.E Dte. [Block-Arambagh]. Assistant Engineer Junior Engineer (Civill) ORD/000221/2022-2023 363/Arg 19/05/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.29 4.28 99.77 0
7 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation MALAYPUR Piped Water Supply Scheme with LDS, FHTC, & Construction of 750 cum capacity OHR with 20 m. staging height including Soil Investigation work at ARAMBAG Block under ARAMBAG Sub-Division under Hooghly Division PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000407/2022-2023 2179/HUG 29/09/2022 180 M/S PRADYUT KUMAR HAZRA 663.67 527.29 79.45 50
8 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Sinking of 3 nos. tube-well (300 X 200 MM) by D.R. Rig method at MAYAPUR, MALAYPUR (2 NOS.) Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte. ORD/000931/2023-2024 987/HUG 16/03/2024 30 BIBHUTI SHAW 46.75 0.00 0 0
9 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Material Requisition To Resource Division RTOR000006/2023-2024 1106/HUG 17/04/2023 Resource Division 22.16 0.00 0 0
10 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Material Requisition To Resource Division RTOR000022/2022-2023 1124/3/HUG 06/06/2022 Resource Division 9.24 0.00 0 0
11 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Material Requisition To Resource Division RTOR000067/2022-2023 1773/1/Hug 29/08/2022 Resource Division 0.69 0.00 0 0
12 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Material Requisition To Resource Division RTOR000148/2023-2024 1385/19/Hug 15/05/2023 Resource Division 17.82 0.00 0 0
13 HOOGHLY Electrical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Adhoc Payment to WBSEDCL against Service Connection BILL/01124/2023-2024 null 28/06/2023 WBSEDCL 89.37 0.00 0 0
14 HOOGHLY Electrical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Augmentation of Malaypur water supply scheme TW No I and II Block Arambag, District Hooghly under ED PHED. Assistant Engineer 2 Junior Engineer4 ORD/000288/2022-2023 938/ED 22/02/2023 90 MAHADEV ENTERPRISE 21.42 21.12 98.6 40
15 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Providing drilling crew and other allied works for construction of Tube Well (300mm x 200mm x 150Mtrs. Depth) by utilising departmental machineries for Malaypur W/S Scheme (T/W I & II). Arambag Block under Hooghly District, Central Drilling Division, PHE Dte. Driller In Charge Junior Engineer ORD/000034/2023-2024 17/CDD 04/04/2023 30 ASHUTOSH DAS & CO 22.26 19.63 88.19 50
16 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Hiring of diesel driven motor cab (BS-III & Above) (Non AC) having contract carriage permit along with driver for the Calcutta Mechanical Sub Division-I, P.H.Engineering Dte. under CMSD-II(D), CDD, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000048/2023-2024 217/CMSD-II(D) 26/09/2023 92 SUJATA BHOWMICK 0.44 0.74 168.18 33
17 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Continuation for hiring of diesel driven Motor Cab (BS-III & Above) having contract carriage permit along with driver for the office of the Executive Engineer, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000145/2023-2024 120/S&WSD 31/10/2023 61 ASHUTOSH DAS & CO 0.29 0.54 186.21 15
18 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Providing drilling crew and other allied works for construction of Tube Well (300mm X200mm X 150 Mtrs. Depth) by utilising Departmental Machineries for Malaypur W/S Scheme (TW-I), under Hooghly District, Central Drilling Division, P.H.E. Dte. ORD/000189/2023-2024 1434/CDD 29/09/2023 30 ASHUTOSH DAS & CO 10.74 4.53 42.18 100
19 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. , SM/10341 Augmentation Providing drilling crew and other allied works for construction of Tube Well (300mm x 200mm x 180 Mtrs. Depth) by utilising departmental machineries for Malaypur W/S Scheme Arambagh Block under Hooghly District, Central Drilling Division, PHE Dte. Driller In Charge Junior Engineer ORD/000484/2022-2023 2002/CDD 09/02/2023 30 M/S SAIKAT ENTERPRISE 12.54 10.63 84.77 100
Total 958.64 588.76 61.42