Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 452.85 288.98 63.81  
1 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation WBSEDCL bill for Atghara PWSS BILL/00408/2022-2023 BP-2022-23-659 29/03/2023 EXECUTIVE ENGINEER, ELECTRICAL DIVISION, PHE DTE 5.37 0.00 0 0
2 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Sinking of I (one) No Big dia tube well (250 mm X 150mm) with supply of PVC Pipe and strainer and having depth upto 150 M at 3rd TW site of Arandi W/S Scheme under Arambagh Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer Junior Engineer (Civill) ORD/000140/2022-2023 1411/HUG 12/07/2022 30 OSMAN SEKH 8.60 8.57 99.65 100
3 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Construction of 1 No. switch room (5.40 m x 3.60 m) with sanitary arrangement At Proposed T.W Site OF ATGHARA Water Supply Scheme Under Arambagh Sub-Division Under Hooghly Division P.H.E Dte. Assistant Engineer ORD/000192/2023-2024 1775/HUG 15/06/2023 45 SOUMYAJIT DUTTA 7.34 7.34 100 100
4 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Preparation of DPR for Augmentation of ATGHARA Piped Water Supply Scheme Under Arambagh Sub-Division of Hooghly Division P.H.E Dte. [Block-Khanakul-I]. Assistant Engineer Junior Engineer (Civill) ORD/000378/2021-2022 609/Arg 31/12/2021 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 3.67 3.67 100 100
5 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Augmentation of ATGHARA Water Supply Scheme with Laying Distribution System & Functional Household Tap Connection within Shrirampur, Kaiba & Atghara Mouza, Repairing of existing OHR at Khanakul-I Block under Arambag Sub-Division, PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000381/2022-2023 1181/HUG 15/06/2022 60 RURAL CONSTRUCTION (MANIK CHANDRA ADAK) 207.80 193.71 93.22 10
6 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Augmentation of ATGHARA Water Supply Scheme with Laying Distribution System & Functional Household Tap Connection Within Sekendarpur & Helan Mouza, Repairing of Switch room, Boundary wall at Khanakul-I Block under Arambag Sub-Division, PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000382/2022-2023 1180/HUG 15/06/2022 810 M/S R.K. CHOUDHURI 139.82 59.68 42.68 80
7 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Sinking of 1 no 300 X200 mm dia Tube Well 180 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at proposed Tube Well Site of ATGHARA W/S Scheme under ARAMBAG Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer ORD/000671/2022-2023 165/HUG 16/01/2023 30 M/S EMON ENTERPRISE 12.83 0.00 0 0
8 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Material Requisition To Resource Division RTOR000104/2022-2023 1773/38/Hug 29/08/2022 Resource Division 0.69 0.00 0 0
9 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Material Requisition To Resource Division RTOR000146/2023-2024 1385/17/Hug 15/05/2023 Resource Division 5.48 0.00 0 0
10 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Material Requisition To Resource Division RTOR000164/2021-2022 424/5/Hug 07/03/2022 Resource Division 36.05 0.00 0 0
11 HOOGHLY Electrical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Augmentation of Atghara water supply scheme TW No I Block Khanakul I District Hooghly under ED PHED. Assistant Engineer 2 Junior Engineer4 ORD/000286/2022-2023 936/ED 22/02/2023 90 OSMAN SEKH 10.75 5.18 48.19 40
12 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation SUPPLY & DELIVERY OF PEA SIZE GRAVELS FOR CONSTRUCTION OF TUBE WELL AT SOLEPUR DUTTAPUR (Z-II) PWSS, TARAKESWAR BLOCK, HOOGHLY DISTRICT UNDER CMSD-II (D), CDD, PHE DTE. Driller In Charge Junior Engineer ORD/000272/2022-2023 530/CMSD-II 01/12/2022 7 C.M. ENTERPRISE 0.98 0.00 0 100
13 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (300MM X 200MM X 210 MTRS DEPTH) BY UTILIZING DEPARTMENTAL MACHINERIES FOR ATGHARA PWSS, TW-III, UNDER HOOGHLY DISTRICT, CDD, PHE DTE. Driller In Charge Junior Engineer ORD/000273/2022-2023 1562/CDD 08/12/2022 30 C.M. ENTERPRISE 12.49 10.00 80.06 100
14 HOOGHLY Central Drilling AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. , SM/09692 Augmentation SUPPLY & DELIVERY OF PEA SIZE GRAVELS FOR CONSTRUCTION OF TUBE WELL AT ATGHARA PWSS TW-III, HOOGHLY DISTRICT UNDER CMSD-II (D), CDD, PHE DTE. ORD/000274/2022-2023 530/CMSD-II (D) 01/12/2022 7 C.M. ENTERPRISE 0.98 0.83 84.69 100
Total 452.85 288.98 63.81