Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 5.7 4.15 72.81  
1 HOOGHLY Hooghly Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF UTTAR CHANDANNAGAR WATER SUPPLY SCHEME. , SM/09071 Retrofitting Soil Investigation for the work of Cons. of RCC elevated Reservoir ... for Paba & its Adj. Mouzas W/S Scheme under Arambagh S/D PHE Dte. ORD/000015/2016-2017 334/Hug 20/04/2016 MONDAL ENTERPRISE 0.00 4.15 INF 0
2 HOOGHLY Hooghly Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF UTTAR CHANDANNAGAR WATER SUPPLY SCHEME. , SM/09071 Retrofitting 1ST Continuation of Engagement of 2 nos Valve operators for the period from 01/07/2023 to 31/08/2023 for Dharampur & Uttarchandannagar W/S Scheme under Chinshurah Sub - Division, P.H.E. Dte. Assistant Engineer (Civil) ORD/000392/2023-2024 571/CH 30/06/2023 124 SOUMYADIP DE 0.71 0.00 0 0
3 HOOGHLY Hooghly Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF UTTAR CHANDANNAGAR WATER SUPPLY SCHEME. , SM/09071 Retrofitting Restoration & repairing of village road damaged due to laying of pipeline of piped water supply schemes under JJM in CHINSURAH-MOGRA Block. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000918/2023-2024 253/CH 12/03/2024 30 BIMAL KUMAR HALDER 4.99 0.00 0 0
Total 5.69 4.15 72.85