Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 21,698.41 6.01 0.03  
1 NORTH 24 PARAGANAS Barasat - II Central Drilling TEGHARIA Piped Water Supply Scheme , SM/16457 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 NORTH 24 PARAGANAS Barasat - II Barasat Arsenic Division TEGHARIA Piped Water Supply Scheme , SM/16457 New Survey, Design Drawing & DPR Preparation for TEGHARIA Water Supply Scheme (NEW PWSS) in BARASAT-II BLOCK under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000005/2023-2024 982/B.Ar.D. 20/04/2023 30 TIYAS CONSULTANCY AND INFRASTRUCTURE PRIVATE LIMITED 6.01 6.01 100 100
3 NORTH 24 PARAGANAS Barasat - II Barasat Arsenic Division TEGHARIA Piped Water Supply Scheme , SM/16457 New Laying of Distribution System including specials all complete and Providing Functional House Hold Tap Connection (FHTC) from distribution system within command area & construction of 2 nos. pump house & Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir including soil test as per Departmental design, drawing and specification including bored pile & pile cap at TEGHARIA water supply scheme, Barasat-II block under Barasat Arsenic Division, P.H.E. Dte. Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000092/2023-2024 1883/B.Ar.D. 04/08/2023 360 R. K. MANDAL & CO. 343.74 0.00 0 0
4 NORTH 24 PARAGANAS Barasat - II Barasat Arsenic Division TEGHARIA Piped Water Supply Scheme , SM/16457 New Material Requisition To Resource Division RTOR000005/2023-2024 74/B.Ar.D 11/01/2024 Resource Division 8.90 0.00 0 0
Total 21,698.41 6.01 0.03