Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 181.6 20.71 11.4  
1 NORTH 24 PARAGANAS NTK Mechanical Augmentation of Thakdari Piped Water Supply Scheme in Rajarhat Block of North 24 Parganas District under Barasat Arsenic Division, P.H.E. Dte. , SM/15559 Augmentation Supply & Installation of pumping machineries & other electro-mechanical accessories in Thakdari piped W/S scheme under New Town Kolkata Mechanical Division, P.H.E. Dte. ORD/000041/2023-2024 783 / NTKMD 26/05/2023 180 DIPALI CONSTRUCTION 27.24 0.00 0 85
2 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Thakdari Piped Water Supply Scheme in Rajarhat Block of North 24 Parganas District under Barasat Arsenic Division, P.H.E. Dte. , SM/15559 Augmentation Sinking of 300 mm. x 200 mm. dia. x 330 mtr. deep tube well by direct rotary rig method for 3rd Tubewell at Thakdari of Zone - V, near Thakdari Head Work site under SWBPWSS under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000022/2022-2023 1000/B.Ar.D. 02/06/2022 45 AUXILIARY TUBEWELL DRILLERS 21.16 14.93 70.56 100
3 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Thakdari Piped Water Supply Scheme in Rajarhat Block of North 24 Parganas District under Barasat Arsenic Division, P.H.E. Dte. , SM/15559 Augmentation Supplying & laying, fitting, fixing, jointing etc. of different dia HDPE pipe line for distribution system and Laying of Rising Main from existing H/W Site to OHR Site and Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN6) pipe with all necessary specials, 10 mm gun metal ferrule, saddle piece etc. all complete for Thakdari Water Supply Scheme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000061/2023-2024 1775/B.Ar.D. 27/07/2023 360 SAHA ENTERPRISE 123.54 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Thakdari Piped Water Supply Scheme in Rajarhat Block of North 24 Parganas District under Barasat Arsenic Division, P.H.E. Dte. , SM/15559 Augmentation Supply, delivery, installation & commissioning of 200 mm Dia Electromagnetic Flowmeter, RTU, Sluice valve etc. and other allied works at Thakdari water supply Scheme under Rajarhat Block under SWBPWSS in Rajarhat, Haroa & Bhangar II Block in North 24 Parganas District under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000123/2023-2024 1936/B.Ar.D. 14/08/2023 90 MSA INSTRUMENTS 6.43 2.55 39.66 80
5 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Thakdari Piped Water Supply Scheme in Rajarhat Block of North 24 Parganas District under Barasat Arsenic Division, P.H.E. Dte. , SM/15559 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme Thakdari under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000141/2023-2024 2334/B.Ar.D. 21/09/2023 21 UMWELT ENGINEER PVT. LTD. 3.23 3.23 100 100
Total 181.61 20.71 11.41