Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 21,570.35 113.39 0.53  
1 NORTH 24 PARAGANAS Central Drilling Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No. II under Chowlpur W/S Scheme and Pump House No-III (New) under Dwarir Jangle W/S Scheme District of 24 Pgs. (N) Assistant Engineer ORD/003349/2023-2024 4805/EMD 09/08/2023 30 P.K. ENGINEERING 21.79 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation CONTINUATION ORDER for "Hiring of one (1) no. Diesel operated AC motor cab / maxi cab (Car No. WB-08C-5757) with engine capacity less than or equal to 2000 C.C. with driver for official use for Chief Engineer (Head Quarters), PHE Dte. with all costs towards the owner except fuel cost i.e. Diesel & Mobil oil for the period from 03.07.2023 to 30.09.2023". Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000041/2023-2024 1533/B.Ar.D 30/06/2023 90 RANA PAUL 0.47 0.60 127.66 100
4 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Reconnection and strenthening of existing Functional Household Tap Connection and other allied works at Command area of Chowlpur Ground Water Supply Scheme under Barasat-II Block Under '' JAL JIVAN MISSION'' programme under Barasat Arsenic Division PHE, Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000149/2023-2024 2375/B.Ar.D. 27/09/2023 30 PRAGATI CONSTRUCTION & CO 2.93 1.45 49.49 100
5 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Supplying, Laying, fitting & fixing of different dia UPVC pipe and other allied works at Command area of Chowlpur Ground Water Supply Scheme under Barasat-II Block Under '' JAL JIVAN MISSION'' programme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000150/2023-2024 2376/B.Ar.D. 27/09/2023 30 CHOWDHURY CONSTRUCTION 4.81 2.40 49.9 100
6 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Repair and Renovation works of R.C.C. Elevated Reservoir of Capacity 350 CUM at Chowlpur W/S Scheme of Barasat - II block under Barasat Arsenic Division PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000170/2023-2024 2655/B.Ar.D. 09/11/2023 45 B S ENTERPRISE 13.24 6.52 49.24 100
7 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Chowlpur Water Supply Scheme under Barasat - II Block under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000175/2022-2023 120/B.Ar.D. 18/01/2023 60 M.R.CONSTRUCTION 63.85 62.35 97.65 100
8 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Providing Functional Household Tap Connection and allied works of Command area at Chowlpur Ground Water Supply Scheme under Barasat-II Block Under '' JAL JIVAN MISSION'' programme under Barasat Arsenic Division PHE, Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000204/2022-2023 475/B.Ar.D. 27/02/2023 30 TOJO ENTERPRISE 6.09 5.99 98.36 100
9 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Providing Functional House Hold Tap Connection (FHTC) for uncovered area and laying UPVC / HDPE pipeline and alied works within command area at Chowlpur Water Supply Scheme under Barasat - II Block under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000219/2023-2024 383/B.Ar.D. 21/02/2024 30 P. & S. ASSOCIATES 68.22 34.08 49.96 65
10 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of CHOWLPUR Piped Water Supply Scheme in Barasat-II Block of North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13420 Augmentation Material Requisition To Resource Division RTOR000001/2024-2025 1472/B.Ar.D. 06/09/2024 Resource Division 49.19 0.00 0 0
Total 21,570.36 113.39 0.53