Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 13.28 0 0  
1 NORTH 24 PARAGANAS Barasat Arsenic Division Emergent restoration by repairing and renovation of existing pipeline, providing DG set and arrangement of temporary water supply through mechanised van for uninterrupted supply of drinking water to the extensively damaged ground W/S scheme of Baduria, Ha , SM/09030 Disaster Bullah Pilling for protection of Pipeline (Approx 60 m) near pond of Bulbul Fakir at Fakir Para under Konanagar W/S Scheme at Hasnabad Block due to Super Cyclone "AMPHAN" under Barasat Arsenic Division, P.H.E. Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000283/2021-2022 557/B.Ar.D 23/03/2022 7 SAFE STEP ENTERPRISE 3.87 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Arsenic Division Emergent restoration by repairing and renovation of existing pipeline, providing DG set and arrangement of temporary water supply through mechanised van for uninterrupted supply of drinking water to the extensively damaged ground W/S scheme of Baduria, Ha , SM/09030 Disaster Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Pankoj Bhwomik , Jame Masjid at Maheshpur Majher para under Tildanga W/S Scheme at Baduria block due to Super Cyclone " AMPHAN" under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer ORD/000284/2021-2022 558/B.Ar.D 23/03/2022 7 R. K. MANDAL & CO. 4.80 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Arsenic Division Emergent restoration by repairing and renovation of existing pipeline, providing DG set and arrangement of temporary water supply through mechanised van for uninterrupted supply of drinking water to the extensively damaged ground W/S scheme of Baduria, Ha , SM/09030 Disaster Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near 2nd Pump House under Dwarir Jungle W/S Scheme at Sandeshkhali - II block due to Super Cyclone "Amphan" under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000285/2021-2022 559/B.Ar.D 23/03/2022 7 R. K. MANDAL & CO. 4.61 0.00 0 0
Total 13.28 0.00 0