Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 732.04 450.07 61.48  
1 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Repair and renovation works of R.C.C. Elevaced Reservoir 350 cum at SANTOSHPUR ZONE-I Water Supply scheme in Bongaon Block under North 24 Parganas water Supply Division-I, PHE Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000012/2023-2024 408/NWSD-I 11/04/2023 45 RAKESH ENTERPRISE 13.91 13.90 99.93 100
2 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Repairing & Renovation of BOUNDARY WALL for 146 m Length in Head work site at SANTOSHPUR ZONE-I Water Supply scheme in Bongaon Block under North 24 Parganas water Supply Division-I, PHE Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000013/2023-2024 409/NWSD-I 11/04/2023 45 AYUSH ENTERPRISE 14.26 9.74 68.3 5
3 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Special Repair & Renovation of Pump House at Head Works site & Service Road (60 Mtr. Length X 3 Mtr. Width) at Head Works site at SANTOSHPUR ZONE-I Water Supply scheme in Bongaon Block under North 24 Parganas water Supply Division-I, PHE Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000015/2023-2024 411/NWSD-I 11/04/2023 45 PRABIR KUMAR MONDAL 7.22 6.80 94.18 45
4 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Repairing & Renovation of BOUNDARY WALL for 40 m Length in 2nd Pump house site at Santoshpur Zone - I Water Supply scheme in Bongaon Block under North 24 Parganas water Supply Division-I, PHE Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000016/2023-2024 410/NWSD-I 11/04/2023 45 P & S ASSOCIATES 5.17 4.33 83.75 100
5 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Special Repair & Renovation of Pump House at 2nd Pump house site & Service Road (25 Mtr. Length X 2 Mtr. Width) at 2nd Pump house site at SANTOSHPUR ZONE-I Water Supply scheme in Bongaon Block under North 24 Parganas water Supply Division-I, PHE Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000017/2023-2024 412/NWSD-I 11/04/2023 45 JEET ENTERPRISE 4.18 3.65 87.32 35
6 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Laying of Distribution pipe line including all necessary works at distribution system and Providing Functional House hold Tap Connection (FHTC) including supplying, laying, fitting, fixing of 15 mm NB PVC, schedule 80/20 mm OD HDPE (PE 100, PN 16) pipe with all necessary works within command area of SANTOSHPUR Zone-I Water Supply Scheme under district North 24 Parganas Water Supply Division-I, PHE. Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000039/2022-2023 704/NWSD-I 07/06/2022 90 SUPRITI ENTERPRISE 528.09 407.12 77.09 69
7 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Detail route Survey, Design and preparation of Augmentation DPR in connection with " Providing functional household tap connection to every Household with in Santoshpur (Zone-I) Water Supply Scheme in North 24 Pgs. District under North 24 Pgs. W/S. Division-I P.H.E. Dte." ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000122/2021-2022 1195/NWSD-I 31/12/2021 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.53 4.53 100 1
8 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Material Requisition To Resource Division RTOR000020/2022-2023 737/NWSD-I 13/06/2022 Resource Division 130.25 0.00 0 0
9 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Material Requisition To Resource Division RTOR000020/2024-2025 1311/NWSD-I 30/08/2024 Resource Division 5.54 0.00 0 0
10 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Santoshpur Zone-I to Accommodate FHTC Block- Bongaon, Dist-North 24 Parganas. , SM/10111 Augmentation Material Requisition To Resource Division RTOR000023/2022-2023 748/NWSD-I 14/06/2022 Resource Division 18.89 0.00 0 0
Total 732.04 450.07 61.48