Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 758.3 205.74 27.13  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Banglani to accommodate FHTC , SM/18618 Augmentation Formal work order for Laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection) for Augmentation of Banglani Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000717/2023-2024 2518/BD 22/08/2023 90 KINGS & CO. 606.14 199.72 32.95 26
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Banglani to accommodate FHTC , SM/18618 Augmentation Additional Survey work for DPR Preparation for BANGLANI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002498/2021-2022 457 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.07 1.07 100 100
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Banglani to accommodate FHTC , SM/18618 Augmentation Route Survey, Design Drawing & DPR Preparation for BANGLANI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. Assistant Engineer ORD/003053/2021-2022 456/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 4.95 100 100
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Banglani to accommodate FHTC , SM/18618 Augmentation Material Requisition To Resource Division RTOR000018/2023-2024 1238/BD 25/04/2023 Resource Division 146.14 0.00 0 0
Total 758.29 205.73 27.13