Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 1,067.95 205.58 19.25  
1 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division Dakshin Akhratala Piped Water Supply Scheme , SM/18617 New Formal work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2,3,4 (Size-3.60x3.00 mtr),Laying of DI rising main and DI/UPVC distribution pipe line,Providing Functional Household Tap Connection,Protection works for different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile at different places,Construction of 450 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Dakshin Akhratala water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001208/2023-2024 4047/BD 13/10/2023 365 M/S DATTA ENTERPRISE. 753.32 191.10 25.37 69
2 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division Dakshin Akhratala Piped Water Supply Scheme , SM/18617 New Route Survey, Design Drawing & Preparation of DPR for Kalupur Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001315/2021-2022 122/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.80 0.00 0 1
3 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division Dakshin Akhratala Piped Water Supply Scheme , SM/18617 New Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-A) Assistant Engineer ORD/002738/2021-2022 314/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 100 100
4 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division Dakshin Akhratala Piped Water Supply Scheme , SM/18617 New Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-B) Assistant Engineer ORD/002739/2021-2022 315/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.82 4.82 100 100
5 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division Dakshin Akhratala Piped Water Supply Scheme , SM/18617 New Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-C) Assistant Engineer ORD/002740/2021-2022 336/HSD 21/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 100 100
6 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division Dakshin Akhratala Piped Water Supply Scheme , SM/18617 New Material Requisition To Resource Division RTOR000226/2022-2023 872/BD 22/03/2023 Resource Division 296.35 0.00 0 0
Total 1,067.94 205.58 19.25