Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 21,971.1 52.93 0.24  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Deara to accommodate FHTC , SM/17679 Augmentation Preparation of DPR in connection of augmentation of Deara Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Sl. No.-21 Assistant Engineer Junior Engineer ORD/000314/2022-2023 568/BSD 29/06/2022 30 RADIANT 2.97 1.40 47.14 100
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Deara to accommodate FHTC , SM/17679 Augmentation Formal work order for Construction of 450cum capacity 20mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing FHTC for Augmentation of Deara water supply Scheme under Barasat Sub-Division PHE Dte. Assistant Engineer Junior Engineer ORD/000760/2023-2024 2561/BD 24/08/2023 360 SINGHA ROY & CO. 507.92 51.53 10.15 15
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Deara to accommodate FHTC , SM/17679 Augmentation Material Requisition To Resource Division RTOR000036/2023-2024 1267/BD 25/04/2023 Resource Division 99.41 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Deara to accommodate FHTC , SM/17679 Augmentation Material Requisition To Resource Division RTOR000115/2023-2024 4020/BD 12/10/2023 Resource Division 17.25 0.00 0 0
5 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Deara to accommodate FHTC , SM/17679 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
6 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Deara to accommodate FHTC , SM/17679 Augmentation Payment of invoice bill for new service connection at p/h no: III under Deara water supply scheme. BILL/04751/2023-2024 BP-290-23-24 27/02/2024 W.B.S.E.D.C.L. (GANGANAGAR C.C.C.) 3.79 0.00 0 null
Total 21,971.10 52.93 0.24