Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8 | 21,817.91 | 243.65 | 1.12 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Bargan Gopalpur w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/000147/2023-2024 | 1707/BD | 08/06/2023 | 360 | M/S PROGATI ENTERPRISE. | 403.93 | 232.13 | 57.47 | 90 |
2 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | Acceptance cum work order for Strengthening of existing concrete road for movement of rig machineries for sinking of big dia Tube well at PH No-1 within Bargan Gopalpur w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/000880/2023-2024 | 2715/BD | 05/09/2023 | 10 | PRITAM MUKHOPADHYAY. | 8.46 | 4.22 | 49.88 | 100 |
3 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | Acceptance cum work order for Strengthening of existing concrete road for movement of rig machineries for sinking of big dia Tube well at PH No 2 within Bargan Gopalpur w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/000910/2023-2024 | 2732/BD | 07/09/2023 | 7 | GIRIDHARI DAS | 5.00 | 2.48 | 49.6 | 100 |
4 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BARGAN GOPALPUR Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) | Assistant Engineer | Junior Engineer | ORD/002702/2021-2022 | 247/HSD | 03/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.82 | 4.82 | 100 | 0 |
5 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | Material Requisition To Resource Division | RTOR000204/2022-2023 | 890/BD | 22/03/2023 | Resource Division | 46.13 | 0.00 | 0 | 0 | |||
6 | NORTH 24 PARAGANAS | Minakhan | Central Drilling | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) | Assistant Engineer,Driller In Charge | Junior Engineer | ORD/000001/2023-2024 | 1415/CDD | 21/09/2023 | 300 | JHARGRAM SPV PRIVATE LIMITED | 21,339.76 | 0.00 | 0 | 11 |
7 | NORTH 24 PARAGANAS | Minakhan | Eastern Mechanical | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | New service connection for Bargan Gopalpur PH-I, Bargan Gopalpur minakhan | BILL/04047/2023-2024 | BP-253-23-24 | 20/12/2023 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 4.97 | 0.00 | 0 | 0 | |||
8 | NORTH 24 PARAGANAS | Minakhan | Eastern Mechanical | Bargan Gopalpur Piped Water Supply Scheme , SM/15902 | New | New Service Connection at PH-II under Bargan Gopalpur W/S Scheme | BILL/04123/2023-2024 | BP-262-23-24 | 02/01/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 4.84 | 0.00 | 0 | 0 | |||
Total | 21,817.92 | 243.66 | 1.12 |