Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
9 | 21,858.23 | 91.82 | 0.42 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Kusangra Piped Water Supply Scheme , SM/15832 | New | Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile, Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap within Kusangra W/S Scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/000898/2023-2024 | 2703/BD | 04/09/2023 | 360 | M/S PROGATI ENTERPRISE. | 439.52 | 83.55 | 19.01 | 20 |
2 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Kusangra Piped Water Supply Scheme , SM/15832 | New | Acceptance cum work order for Construction of RCC culvert, cut-off wall, approach road and other allied works at Over Head Reservoir site (HW site) for Kusangra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/001811/2023-2024 | 676/BD | 01/03/2024 | 14 | M/S GHOSH CONSTRUCTION. | 8.58 | 0.00 | 0 | 90 |
3 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Kusangra Piped Water Supply Scheme , SM/15832 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KUSANGRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) | Assistant Engineer | Junior Engineer | ORD/002721/2021-2022 | 284/HSD | 09/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.83 | 4.83 | 100 | 0 |
4 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Kusangra Piped Water Supply Scheme , SM/15832 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KUSANGRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) | Assistant Engineer | Junior Engineer | ORD/002722/2021-2022 | 287/HSD | 10/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.44 | 3.44 | 100 | 0 |
5 | NORTH 24 PARAGANAS | Minakhan | Barasat Division | Kusangra Piped Water Supply Scheme , SM/15832 | New | Material Requisition To Resource Division | RTOR000208/2022-2023 | 893/BD | 22/03/2023 | Resource Division | 45.01 | 0.00 | 0 | 0 | |||
6 | NORTH 24 PARAGANAS | Minakhan | Central Drilling | Kusangra Piped Water Supply Scheme , SM/15832 | New | Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) | Assistant Engineer,Driller In Charge | Junior Engineer | ORD/000001/2023-2024 | 1415/CDD | 21/09/2023 | 300 | JHARGRAM SPV PRIVATE LIMITED | 21,339.76 | 0.00 | 0 | 11 |
7 | NORTH 24 PARAGANAS | Minakhan | Eastern Mechanical | Kusangra Piped Water Supply Scheme , SM/15832 | New | New Service Connection at PH-III under Kusangra W/S Scheme. | BILL/04124/2023-2024 | BP-261-23-24 | 02/01/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 5.60 | 0.00 | 0 | 0 | |||
8 | NORTH 24 PARAGANAS | Minakhan | Eastern Mechanical | Kusangra Piped Water Supply Scheme , SM/15832 | New | Supplementary Quotation for Location Changes for PH- III under Kusangra W/S Scheme in the district of North 24 Pgs. | BILL/05530/2023-2024 | BP-368-23-24 | 21/03/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 4.99 | 0.00 | 0 | null | |||
9 | NORTH 24 PARAGANAS | Minakhan | Eastern Mechanical | Kusangra Piped Water Supply Scheme , SM/15832 | New | Quotation for Service Connection Charges for PH- II under Kusangra W/S Scheme in the district of North 24 Pgs. | BILL/05531/2023-2024 | BP-369-23-24 | 21/03/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 6.50 | 0.00 | 0 | null | |||
Total | 21,858.24 | 91.81 | 0.42 |