Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
9 | 22,039.13 | 42.39 | 0.19 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile, Construction of 250 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap within Khariat Abad W/S Scheme, Sandeshkhali block under Hasnabad Sub-Division, P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/001202/2023-2024 | 4027/BD | 12/10/2023 | 365 | MAHAVIR PUMPS MANUFACTURING PVT.LTD. | 618.97 | 31.01 | 5.01 | 20 |
2 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIAT ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-A) | Assistant Engineer | Junior Engineer | ORD/002741/2021-2022 | 337/HSD | 21/02/2022 | 15 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 4.83 | 4.83 | 100 | 1 |
3 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIAT ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-B) | Assistant Engineer | Junior Engineer | ORD/002742/2021-2022 | 338/HSD | 21/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.83 | 4.83 | 100 | 1 |
4 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIAT ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-C) | Assistant Engineer | Junior Engineer | ORD/002743/2021-2022 | 347/HSD | 21/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 1.72 | 1.72 | 100 | 1 |
5 | NORTH 24 PARAGANAS | Sandeshkhali - I | Barasat Division | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Material Requisition To Resource Division | RTOR000233/2022-2023 | 870/BD | 22/03/2023 | Resource Division | 51.83 | 0.00 | 0 | 0 | |||
6 | NORTH 24 PARAGANAS | Sandeshkhali - I | Central Drilling | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) | Assistant Engineer,Driller In Charge | Junior Engineer | ORD/000001/2023-2024 | 1415/CDD | 21/09/2023 | 300 | JHARGRAM SPV PRIVATE LIMITED | 21,339.76 | 0.00 | 0 | 11 |
7 | NORTH 24 PARAGANAS | Sandeshkhali - I | Eastern Mechanical | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Service connection charges at PH-I under Khariat W/S Scheme | BILL/04752/2023-2024 | BP-291-23-24 | 27/02/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 4.04 | 0.00 | 0 | null | |||
8 | NORTH 24 PARAGANAS | Sandeshkhali - I | Eastern Mechanical | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Quotation for Service Connection Charges for PH- III under Khariat Abad W/S Scheme in the district of North 24 Pgs. | BILL/05535/2023-2024 | BP-367-23-24 | 21/03/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 4.04 | 0.00 | 0 | null | |||
9 | NORTH 24 PARAGANAS | Sandeshkhali - I | Eastern Mechanical | Khariat Abad Piped Water Supply Scheme , SM/15829 | New | Quotation for Service Connection Charges for PH- II under Khariat Abad W/S Scheme in the district of North 24 Pgs. | BILL/05539/2023-2024 | BP-366-23-24 | 21/03/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 9.11 | 0.00 | 0 | null | |||
Total | 22,039.12 | 42.38 | 0.19 |