Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 686.16 144.71 21.09  
1 NORTH 24 PARAGANAS Hingalganj Barasat Division Bhandarkhali Piped Water Supply Scheme , SM/15827 New Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No- 2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Bhandarkhali water supply scheme, Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000725/2023-2024 2512/BD 22/08/2023 360 M/S NIRMAN CONSTRUCTION. 521.98 135.05 25.87 25
2 NORTH 24 PARAGANAS Hingalganj Barasat Division Bhandarkhali Piped Water Supply Scheme , SM/15827 New Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Bhanderkhali w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/001983/2023-2024 918/BD 15/03/2024 60 SAHA CONSTRUCTION & CO 77.65 0.00 0 0
3 NORTH 24 PARAGANAS Hingalganj Barasat Division Bhandarkhali Piped Water Supply Scheme , SM/15827 New Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BHANDARKHALI Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-A) Assistant Engineer Junior Engineer ORD/002693/2021-2022 235/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 100 1
4 NORTH 24 PARAGANAS Hingalganj Barasat Division Bhandarkhali Piped Water Supply Scheme , SM/15827 New Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BHANDARKHALI Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-B) Assistant Engineer Junior Engineer ORD/002694/2021-2022 236/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 100 1
5 NORTH 24 PARAGANAS Hingalganj Barasat Division Bhandarkhali Piped Water Supply Scheme , SM/15827 New Material Requisition To Resource Division RTOR000231/2022-2023 869/BD 22/03/2023 Resource Division 45.98 0.00 0 0
6 NORTH 24 PARAGANAS Hingalganj Eastern Mechanical Bhandarkhali Piped Water Supply Scheme , SM/15827 New Supply, Delivery Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator in connection with Aug. work related to FHTC at Pump House No.I and II under Bhandarkhali WS Scheme Block-Hingalganj New District of 24 Pgs. N ORD/001217/2023-2024 4873/EMD 14/08/2023 30 DEBJYOTI BASU 20.59 0.00 0 0
7 NORTH 24 PARAGANAS Hingalganj Eastern Mechanical Bhandarkhali Piped Water Supply Scheme , SM/15827 New Supply, Delivery Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator in connection with Aug. work related to FHTC at Pump House No. III under Bhandarkhali WS Scheme Block-Hingalganj New District of 24 Pgs.N ORD/001218/2023-2024 4874/EMD 14/08/2023 30 DAS ENTERPRISE (BARANAGAR) 10.30 0.00 0 0
Total 686.15 144.71 21.09