Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
10 | 22,376.7 | 68.05 | 0.3 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Acceptance cum work order for Sinking of 1 no. 300mm. X 200mm.dia. 190.00mtr. deep tubewell by direct rotary rig method, having 300mm.dia. 42.0mtr. long PVC housing pipe & 200mm.dia. 30.0mtr. long filter for Augumentation of Berachampa Zone-IV Water Supply Scheme at OHR Site under Barasat Sub-Division, P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/000280/2024-2025 | 2193/BD | 05/08/2024 | 30 | ANJALI ENTERPRISE. | 13.30 | 0.00 | 0 | 0 | |
2 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-IV under Barasat Sub Division, P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/000610/2022-2023 | 671/BSD | 29/08/2022 | 30 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.95 | 3.95 | 100 | 1 | |
3 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Formal work order for Construction of 700 cum capacity 20mtr staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentation of Berachampa Zone-IV Water Supply scheme under Barasat Sub-Division, P.H.E.Dte | Assistant Engineer | Junior Engineer | ORD/001204/2023-2024 | 4018/BD | 12/10/2023 | 365 | A.P POWER & CONCRETE | 877.47 | 63.66 | 7.25 | 15 | |
4 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Installation of Har Ghar Jal (HGJ) Display Board at different villages of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-F | Assistant Engineer | Junior Engineer | ORD/001849/2023-2024 | 1120./1/BSD | 09/02/2024 | 4 | S.M.TRADERS. | 0.87 | 0.44 | 50.57 | 100 | |
5 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Construction of Pump House with latrine at Berachampa Zone-IV water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. | Junior Engineer | ORD/002153/2023-2024 | 1244/BSD | 15/03/2024 | 30 | M/S S.HAQUE & CO. | 4.88 | 0.00 | 0 | 0 | ||
6 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Material Requisition To Resource Division | RTOR000106/2023-2024 | 3086/BD | 10/10/2023 | Resource Division | 28.89 | 0.00 | 0 | 0 | ||||
7 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Material Requisition To Resource Division | RTOR000133/2023-2024 | 4371/BD | 10/11/2023 | Resource Division | 94.42 | 0.00 | 0 | 0 | ||||
8 | NORTH 24 PARAGANAS | Central Drilling | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) | Assistant Engineer,Driller In Charge | Junior Engineer | ORD/000001/2023-2024 | 1415/CDD | 21/09/2023 | 300 | JHARGRAM SPV PRIVATE LIMITED | 21,339.76 | 0.00 | 0 | 11 | |
9 | NORTH 24 PARAGANAS | Eastern Mechanical | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | New service connection at P.H.No- I Zone-IV of Berachampa water supply scheme under EMSD-I ,PHE Dte .in 24Pgs(N). | BILL/04803/2023-2024 | BP-307-23-24 | 04/03/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 3.05 | 0.00 | 0 | null | ||||
10 | NORTH 24 PARAGANAS | Eastern Mechanical | Augmentation of Berachampa Zone-4 Piped Water Supply Scheme , SM/15323 | Augmentation | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No. Garibpur W/S Scheme (P/H -I) District of 24 Pgs. (N). N.I.E.T No. 29 of EE / EMD of 2022-2023 (2022_PHED_434059_36) | ORD/001887/2023-2024 | 6732/EMD | 28/11/2023 | 30 | A.G ENTERPRISE. | 10.11 | 0.00 | 0 | 0 | |||
Total | 22,376.70 | 68.05 | 0.3 |