Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 22,692.72 74.17 0.33  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Preparation of DPR in connection of augumentation of Bodai Water Supply Scheme Zone-II under Barasat Sub Division, P.H.E. Dte. Sl. No.-02 Assistant Engineer Junior Engineer ORD/000288/2022-2023 549/BSD 29/06/2022 30 RADIANT 3.41 1.69 49.56 100
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Bodai-II Water Supply Scheme under JJM programme in Amdanga block within Barasat Sub Division, P.H.E.Dte. Assistant Engineer ORD/000301/2024-2025 2229/BD 07/08/2024 90 CHANDA CONSTRUCTION. 433.82 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Formal work order for construction of 750 cum capacity 20 mtr. height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentaion of Bodai (Zone-II) water supply scheme under Barsasat Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000763/2023-2024 2617/BD 29/08/2023 360 SUPRITI ENTERPRISE. 874.90 72.04 8.23 20
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Amdanga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-C Assistant Engineer Junior Engineer ORD/001839/2023-2024 1116A/BSD 09/02/2024 4 M.R.CONSTRUCTION. 0.88 0.44 50 100
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Acceptance cum work order for for Construction of Pump House with latrine at Bodai Zone-II water Supply Scheme under Amdanga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. Assistant Engineer ORD/002255/2023-2024 932/BD 15/03/2024 30 M/S DAS & CO. 5.09 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Material Requisition To Resource Division RTOR000112/2023-2024 3095/BD 10/10/2023 Resource Division 21.72 0.00 0 0
7 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
8 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC , SM/14162 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.IV (Zone-II) (New) under Bodai W/S Scheme District of 24 Pgs. (N) ORD/001149/2023-2024 4752/EMD 07/08/2023 30 SMILE 13.14 0.00 0 0
Total 22,692.73 74.17 0.33