Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
10 | 2,373.56 | 1,223.23 | 51.54 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Kalitala water supply scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/000008/2023-2024 | 1151/BD | 13/04/2023 | 90 | UMWELT ENGINEER PVT.LTD. | 851.89 | 605.91 | 71.13 | 100 | |
2 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Formal work order for Construction of 250 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Kalitala (Zone-I) water supply scheme, Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | ORD/000205/2023-2024 | 1730/BD | 08/06/2023 | 360 | M/S PROGATI ENTERPRISE. | 141.21 | 0.00 | 0 | 0 | ||
3 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Formal work order for Construction of 250 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Kalitala (Zone-I) water supply scheme, Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | ORD/000216/2023-2024 | 1731/BD | 08/06/2023 | 360 | M/S PROGATI ENTERPRISE. | 141.21 | 0.00 | 0 | 0 | ||
4 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Formal work order for Construction of 300 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Kalitala (Zone-II) water supply scheme, Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/000218/2023-2024 | 1733/BD | 08/06/2023 | 365 | M/S NIRMAN CONSTRUCTION. | 150.78 | 27.21 | 18.05 | 35 | |
5 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kalitala w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. | Assistant Engineer | ORD/000726/2023-2024 | 2476/BD | 18/08/2023 | 30 | M/S DATTA ENTERPRISE. | 63.24 | 23.51 | 37.18 | 98 | ||
6 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kalitala w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. | Assistant Engineer | ORD/000728/2023-2024 | 2477/BD | 18/08/2023 | 30 | M/S PROGATI ENTERPRISE. | 63.27 | 43.87 | 69.34 | 71 | ||
7 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Kalitala water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/001148/2022-2023 | 654/BD | 28/02/2023 | 90 | SUPRITI ENTERPRISE. | 610.10 | 522.73 | 85.68 | 60 | |
8 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Material Requisition To Resource Division | RTOR000162/2023-2024 | 4509/BD | 28/11/2023 | Resource Division | 17.23 | 0.00 | 0 | 0 | ||||
9 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Material Requisition To Resource Division | RTOR000254/2022-2023 | 925/BD | 22/03/2023 | Resource Division | 280.28 | 0.00 | 0 | 0 | ||||
10 | NORTH 24 PARAGANAS | Eastern Mechanical | Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas , SM/14153 | Augmentation | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II, III, IV & V under Kalitala W/S Scheme District of 24 Pgs. (N) | ORD/001171/2023-2024 | 4799/EMD | 09/08/2023 | 30 | ASHUTOSH DAS & CO. | 54.35 | 0.00 | 0 | 0 | |||
Total | 2,373.57 | 1,223.25 | 51.54 |