Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
13 | 493.33 | 75.15 | 15.23 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line & providing Functional Household Tap Connection with other allied works for Augmentation of Sandeshkhali water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/000029/2023-2024 | 1300/BD | 26/04/2023 | 90 | KINGS & CO. | 356.31 | 59.10 | 16.59 | 9 | |
2 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Acceptance cum work order for Arrangement Of Block Level Orientation programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks ( Sandeshkhali- I & II ) in North 24 Parganas under Barasat Division, P.H.E Dte. | Assistant Engineer | Junior Engineer | ORD/000172/2024-2025 | 755/HSD | 19/07/2024 | 10 | IMAGIN | 0.98 | 0.49 | 50 | 0 | |
3 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Acceptance cum work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. for the period from 01.09.2024 to 01.09.2025. | Assistant Engineer | ORD/000411/2024-2025 | 2484/BD | 29/08/2024 | 366 | SUSMITA MANDAL. | 13.34 | 0.00 | 0 | 0 | ||
4 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Sandeshkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | Assistant Engineer | ORD/000729/2023-2024 | 2478/BD | 18/08/2023 | 30 | M/S SUKANTA ENTERPRISE. | 31.71 | 0.00 | 0 | 0 | ||
5 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Acceptance cum work order for Providing Functional tap connection at Radharani High School at Sandeshkhali in connection with augmentation of Sandeshkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | Assistant Engineer | ORD/000868/2023-2024 | 1054/HSD | 31/08/2023 | 7 | M/S RAJPATH CONSTRUCTION. | 0.90 | 0.00 | 0 | 0 | ||
6 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/002429/2023-2024 | 33/HSD | 09/01/2024 | 10 | M/S RAJPATH CONSTRUCTION. | 0.92 | 0.00 | 0 | 100 | |
7 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.11.23 to 31.03.24 = 152 days. | Assistant Engineer | Junior Engineer | ORD/002444/2023-2024 | 1362/HSD | 31/10/2023 | 150 | SUSMITA MANDAL. | 2.26 | 7.48 | 330.97 | 10 | |
8 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Continuation order for one motor launch (M.V. JOYMAKALI) on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.09.23 to 31.10.23 = 61 days. | Assistant Engineer | Junior Engineer | ORD/002445/2023-2024 | 1030/HSD | 29/08/2023 | 60 | SUSMITA MANDAL. | 0.91 | 2.66 | 292.31 | 5 | |
9 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Work order for Supply of Mechanized boat on hire basis with providing driver, helper and other requirement as per terms condition and specification as per direction of the EIC under Hasnabad Sub-Division, P.H.E. Dte. Period : 01.11.23 to 30.04.24 | Assistant Engineer | Junior Engineer | ORD/002446/2023-2024 | 1396/HSD | 31/10/2023 | 180 | RANJIT KUMAR MANDAL | 1.61 | 5.42 | 336.65 | 5 | |
10 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/002449/2023-2024 | 34/HSD | 09/01/2024 | 10 | M/S RAJPATH CONSTRUCTION. | 0.92 | 0.00 | 0 | 100 | |
11 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Material Requisition To Resource Division | RTOR000121/2023-2024 | 4174/BD | 30/10/2023 | Resource Division | 10.35 | 0.00 | 0 | 0 | ||||
12 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Material Requisition To Resource Division | RTOR000248/2022-2023 | 937/BD | 22/03/2023 | Resource Division | 50.86 | 0.00 | 0 | 0 | ||||
13 | NORTH 24 PARAGANAS | Eastern Mechanical | Augmentation of ground water based piped water supply scheme for Sandeshkhali , SM/14152 | Augmentation | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I & II under Sandeshkhali W/S Scheme , District of 24 Pgs. (N) | ORD/001263/2023-2024 | 4932/EMD | 18/08/2023 | 30 | SWAPAN ENTERPRISE | 22.26 | 0.00 | 0 | 0 | |||
Total | 493.33 | 75.15 | 15.23 |