Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 236.03 89.64 37.98  
1 NORTH 24 PARAGANAS Barasat Division Additional detail project report for augmentation of Ground water based PWSS for Gangrapota , SM/13984 Augmentation Acceptance cum work order for Repairing and renovation works for 450 cum. capacity 20mtr. Staging height R.C.C. Over Head water Reservoir for Augmentation of Gangrapota Water Supply Scheme,Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000020/2024-2025 1537/BD 07/06/2024 45 MONDAL ENTERPRISE. (BARASAT) 18.37 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Additional detail project report for augmentation of Ground water based PWSS for Gangrapota , SM/13984 Augmentation Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Gangrapota(Additional) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000242/2023-2024 2030/BD 13/07/2023 90 RAJ KUMAR MONDAL 175.40 87.04 49.62 70
3 NORTH 24 PARAGANAS Barasat Division Additional detail project report for augmentation of Ground water based PWSS for Gangrapota , SM/13984 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gangrapota Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001170/2023-2024 2928/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.13 2.60 16.12 100
4 NORTH 24 PARAGANAS Barasat Division Additional detail project report for augmentation of Ground water based PWSS for Gangrapota , SM/13984 Augmentation Hiring of an Additional Vehicle (Diesel) for the site inspection of different ongoing schemes under JJM Program at Bongaon Sub-Division, P.H.E.Dte. ORD/001520/2023-2024 484/Bon 30/06/2023 180 VAI ENTERPRISE. 0.87 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Additional detail project report for augmentation of Ground water based PWSS for Gangrapota , SM/13984 Augmentation Material Requisition To Resource Division RTOR000095/2023-2024 1862/BD 23/06/2023 Resource Division 12.63 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Additional detail project report for augmentation of Ground water based PWSS for Gangrapota , SM/13984 Augmentation Material Requisition To Resource Division RTOR000102/2023-2024 2093/BD 18/07/2023 Resource Division 12.63 0.00 0 0
Total 236.02 89.65 37.98