Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 267.7 108.08 40.37  
1 NORTH 24 PARAGANAS Bongaon Barasat Division Garibpur Piped water supply scheme , SM/13897 New Formal Work order for Construction of 100 cum. capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile, pile cap & Soil Investigation and laying of Rising Main, Distribution Main with Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Garibpur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. (New Scheme) Assistant Engineer Junior Engineer ORD/000248/2023-2024 2057/BD 14/07/2023 360 AMIT KUMAR BOSE. 223.93 95.84 42.8 54
2 NORTH 24 PARAGANAS Bongaon Barasat Division Garibpur Piped water supply scheme , SM/13897 New Survey, Design, Drawing & DPR preparation for new PWSS at Garibpur water supply scheme in the Bongaon Block under Bongaon Sub-Division, under Barasat Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000852/2022-2023 348/Bon 07/07/2022 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.45 4.45 100 1
3 NORTH 24 PARAGANAS Bongaon Barasat Division Garibpur Piped water supply scheme , SM/13897 New Acceptance cum work order for Sinking of 1 (one) no. new 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Garibpur Piped Water Supply Scheme at H/W Site under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001015/2023-2024 2832/BD 15/09/2023 30 NADIA TUBEWELLS 21.56 7.79 36.13 100
4 NORTH 24 PARAGANAS Bongaon Barasat Division Garibpur Piped water supply scheme , SM/13897 New Acceptance cum work order for Construction of 5.40 mtr. X 3.60mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at Head Work site at Garibpur w/s scheme Bongaon Block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/002173/2023-2024 607/BD 23/02/2024 45 TAPAN GHOSH. 5.61 0.00 0 0
5 NORTH 24 PARAGANAS Bongaon Barasat Division Garibpur Piped water supply scheme , SM/13897 New Material Requisition To Resource Division RTOR000096/2023-2024 1866/BD 23/06/2023 Resource Division 4.65 0.00 0 0
6 NORTH 24 PARAGANAS Bongaon Eastern Mechanical Garibpur Piped water supply scheme , SM/13897 New New service connection at P.H.No- I of Garibpur water supply scheme under EMSD-I ,PHE Dte. In 24Pgs(N). BILL/04883/2023-2024 BP-328-23-24 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 7.50 0.00 0 null
Total 267.70 108.09 40.38