Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 22,006.27 128.88 0.59  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation Formal work order for Construction of 450 cum capacity 20 Mtr. staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Berachampa Zone-III Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000565/2023-2024 2449/BD 16/08/2023 360 H.I.ENTERPRISE. 621.51 118.52 19.07 35
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-III under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000609/2022-2023 668/BSD 25/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.73 3.73 100 1
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-E Assistant Engineer Junior Engineer ORD/001847/2023-2024 1120/BSD 09/02/2024 4 S.M.TRADERS. 0.87 0.44 50.57 100
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. big dia. 185 mtr deep Tube well by D.R. Rig method having 300 mm dia 42.0 mtr. long PVC housing pipe & 200 mm dia 30.0 mtr. long filter for Augmentation Berachampa Zone-III Water Supply Scheme (Head Work Site) of Barasat Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001926/2023-2024 803/BD 12/03/2024 30 ACME CONSTRUCTION 13.08 6.19 47.32 100
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation Construction of Pump House with latrine at Berachampa Zone-III water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002152/2023-2024 1243/BSD 15/03/2024 30 D.K.CONSTRUCTION 4.91 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation Material Requisition To Resource Division RTOR000105/2023-2024 3088/BD 10/10/2023 Resource Division 17.77 0.00 0 0
7 NORTH 24 PARAGANAS Central Drilling Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
8 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Berachampa Zone-3 Piped Water Supply Scheme , SM/13894 Augmentation New service connection at P.H.No- I ,Zone- III of Berachampa water supply scheme under EMSD-I ,PHE Dte .im24Pgs(N). BILL/04805/2023-2024 BP-305-23-24 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.64 0.00 0 null
Total 22,006.28 128.88 0.59