Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 21,925.91 182.39 0.83  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Arrangement of Block Level Orientation Programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks (Amdanga & Deganga) in North 24 Parganas under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000247/2024-2025 172/BSD 10/06/2024 7 IMAGIN 0.98 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Formal work order for Construction of 450 cum capacity 20 Mtr. staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Berachampa Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000564/2023-2024 2447/BD 16/08/2023 360 H.I.ENTERPRISE. 556.61 173.05 31.09 25
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-II under Barasat Sub Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000606/2022-2023 659/BSD 18/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 3.58 99.17 1
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-D Assistant Engineer Junior Engineer ORD/001844/2023-2024 1119/1/BSD 09/02/2024 4 M.R.CONSTRUCTION. 0.88 0.44 50 100
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Repairing & Renovation of 1 No. Pump House (P.H. No-IV) and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002945/2021-2022 832/BSD 16/12/2021 30 ROMI TREDERS. 1.25 1.18 94.4 1
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Repairing & Renovation of 02 Nos. Pump House (P.H. No.-II & III) and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002953/2021-2022 831/BSD 16/12/2021 30 KABASI ENTERPRISE. 2.51 2.39 95.22 1
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002954/2021-2022 830/BSD 16/12/2021 30 P.ENTERPRISE. 1.85 1.75 94.59 1
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Material Requisition To Resource Division RTOR000104/2023-2024 3087/BD 10/10/2023 Resource Division 18.46 0.00 0 0
9 NORTH 24 PARAGANAS Central Drilling Augmentation of Berachampa Zone-2 Piped Water Supply Scheme , SM/13893 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 21,925.92 182.40 0.83