Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 23,597.11 263.85 1.12  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Regarding Restoration charges for road damages. BILL/03461/2023-2024 BP-2023-24-830 15/03/2024 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 76.53 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-II water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000030/2023-2024 1301/BD 26/04/2023 90 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 766.02 84.38 11.02 29
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-I B water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000128/2023-2024 1694/BD 08/06/2023 90 SUPRITI ENTERPRISE. 581.97 106.92 18.37 20
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Hiring Diesel Luxury Car on daily basis for the supervision of work and office uses under Basirhat Sub-Division P.H.E. Dte. (Period: 01.07.2024 to 31.12.2024), Sl.No. - 02 Assistant Engineer Junior Engineer ORD/000159/2024-2025 1018/BHTSD 28/06/2024 184 DEB KUMAR DAS. 0.87 0.37 42.53 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-I A water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000172/2023-2024 1726/BD 08/06/2023 90 SUJIT KUMAR SAHA 224.48 72.18 32.15 10
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Material Requisition To Resource Division RTOR000025/2023-2024 1248/BD 25/04/2023 Resource Division 520.48 0.00 0 0
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Material Requisition To Resource Division RTOR000138/2023-2024 4424/BD 10/11/2023 Resource Division 47.88 0.00 0 0
8 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
9 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC , SM/13405 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.II (Rep.) and IV (New) under Gokna W/S Scheme and Pump House No- II (Rep) under Arsula W/S Scheme District of 24 Pgs. (N) ORD/001912/2023-2024 6735/EMD 29/11/2023 30 M.S. ENTERPRISE 39.12 0.00 0 0
Total 23,597.12 263.86 1.12