Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 544.22 127.23 23.38  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Regarding Restoration charges for road damages. BILL/03471/2023-2024 BP-2023-24-830 15/03/2024 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 24.25 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bithari Zone-II A water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000136/2023-2024 1710/BD 08/06/2023 90 UTPAL CONSTRUCTION & CO. 234.15 88.90 37.97 50
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bithari Z-II B water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000163/2023-2024 1719/BD 08/06/2023 90 CHAKRABORTTI ENTERPRISE. 180.55 32.95 18.25 20
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. big dia. 330 mtr deep tubewell by D.R. Rig method using PVC pipe & strainer having 300 mm dia. 36 mtr. long filter for Augmentation of Bithari Zone-IIB water supply scheme in Baduria Block of Basirhat Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000977/2023-2024 2801/BD 12/09/2023 30 DHELA BABA ENTERPRISE 23.31 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Route Survey, Design Drawing & DPR Preparation for Bithari Z-II Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte Assistant Engineer Junior Engineer ORD/002966/2021-2022 452/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.75 4.75 100 1
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Additional Survey work for DPR Preparation for BITHARI ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002967/2021-2022 453/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.63 0.63 100 1
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Material Requisition To Resource Division RTOR000016/2023-2024 1263/BD 25/04/2023 Resource Division 52.64 0.00 0 0
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC , SM/12895 Augmentation Material Requisition To Resource Division RTOR000142/2023-2024 4427/BD 10/11/2023 Resource Division 23.94 0.00 0 0
Total 544.20 127.23 23.38