Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 24,386.97 414.51 1.7  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Road Restoration work BILL/00857/2024-2025 null 12/09/2024 EXECUTIVE ENGINEER-II, P.W.D,BARASAT DIVN 76.63 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Dakshin Chatra Zone-I water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000023/2023-2024 1210/BD 20/04/2023 90 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 971.71 360.63 37.11 38
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Supply of Sluice valve (200 mm) including construction of Sluice valve chamber for Augmentation of Dakshin Chatra Zone-I Water Supply Scheme under Basirhat Sub Division , P.H.E. Dte. under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000075/2024-2025 928/BHTSD 24/05/2024 7 ROHAN MONDAL. 0.97 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Laying of HDPE pipe line and Repairing of DI pipelines including supply of Sluice valve (200 mm) for interconnection of AIRP under Augmentation work of Dakshin Chatra Zone-I Water Supply Scheme under Basirhat Sub Division , P.H.E. Dte. under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000079/2024-2025 929/BHTSD 24/05/2024 7 S.R.M. ENTERPRISE. 1.00 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Dismantling of a dilapidated Room due to construction of Bio Eco Tech Plant at the Head Work site of Dakshin Chatra Zone - I Water Supply Scheme under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000093/2024-2025 942/BHTSD 24/05/2024 7 N.R.ENTERPRISE. 0.97 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Hiring Diesel Luxury Car on daily basis (for 06 months from 01.01.2023 to 30.06.2023) for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001343/2022-2023 1420 /BHTSD 30/12/2022 181 OM ENTERPRISE 0.86 2.33 270.93 100
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Formal work order for In-Situ Bio Eco Tech Based Ground Water Treatment Plant for Arsenic & Iron Contaminated Areas of Dakshin Chatra Zone-I Water Supply Scheme under BAduria Block of North 24 Parganas District on Pilot basis & subsequent O & M for 15(Fifteen) years. Assistant Engineer Junior Engineer ORD/001358/2016-2017 96/BD 13/01/2017 20 UNITED WATERS INDIA PVT LTD. 1,640.17 31.24 1.9 65
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Route Survey, Design Drawing & DPR Preparation for DAKSHIN CHATRA ZONE -1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001979/2021-2022 351/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 4.95 100 1
9 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Additional Survey work for DPR Preparation for DAKSHIN CHATRA ZONE -1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001980/2021-2022 352/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.38 1.36 98.55 1
10 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Continuation Work for Hiring Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period: 01.01.2024 to 30.06.2024 for Six Month) Assistant Engineer Junior Engineer ORD/002197/2023-2024 1290/BHTSD 29/12/2023 182 DEB KUMAR DAS. 0.86 1.51 175.58 100
11 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Material Requisition To Resource Division RTOR000023/2023-2024 1254/BD 25/04/2023 Resource Division 260.28 0.00 0 0
12 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Material Requisition To Resource Division RTOR000063/2023-2024 1632/BD 01/06/2023 Resource Division 48.44 0.00 0 0
13 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 7.49 0.04 11
14 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Providing power distribution arrangement with allied works at P.H.No- I ,Zone-I of Dakshin Chatra Ground water based W/S Scheme under EMD ,PHE Dte.in 24Pgs(N). Assistant Engineer Junior Engineer ORD/001801/2023-2024 6459/EMD 02/11/2023 30 PIONEER ELECTRICALS 12.91 5.00 38.73 100
15 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC , SM/12568 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No II (Rep.) (Zone-I and II) under Dakshin Chatra W/S Scheme District of 24 Pgs. (N) ORD/001911/2023-2024 6734/EMD 29/11/2023 30 CONCORD ENGINEERING 26.08 0.00 0 0
Total 24,386.95 414.51 1.7