Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 1,854.4 781.08 42.12  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Regarding Restoration charges for road damages. BILL/03465/2023-2024 BP-2023-24-830 15/03/2024 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 49.56 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Regarding Restoration charges for road damages. BILL/03468/2023-2024 BP-2023-24-830 15/03/2024 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 32.73 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Formal work order for Laying of UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection) for Augmentation of Nalabara Zone-II Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000005/2023-2024 1125/BD 11/04/2023 90 H.I.ENTERPRISE. 634.74 552.32 87.02 60
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Formal work order for Laying of DI / UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection) by Augmentation of Nalabara (Zone-I) Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000776/2023-2024 2713/BD 05/09/2023 90 GARGO TRADERS 559.43 220.18 39.36 72
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. big dia. 300 mtr deep tubewell by D.R. Rig method using PVC pipe & strainer having 300 mm dia. 36 mtr. long filter for Augmentation of Nalabara Zone-II water supply scheme in Swarupnagar Block of Basirhat Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000980/2023-2024 2800/BD 12/09/2023 30 DHELA BABA ENTERPRISE 21.53 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Route Survey, Design Drawing & DPR Preparation for Nalabara Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002751/2021-2022 454/ BHTSD 23/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.97 4.97 100 1
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Route Survey, Design Drawing & DPR Preparation for Nalabara Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002752/2021-2022 455/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 3.61 100 1
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Material Requisition To Resource Division RTOR000014/2023-2024 1260/BD 25/04/2023 Resource Division 381.58 0.00 0 0
9 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Material Requisition To Resource Division RTOR000067/2023-2024 1629/BD 01/06/2023 Resource Division 71.08 0.00 0 0
10 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation New service connection at P.H.No- II of Nalabora water supply scheme under EMSD-I ,PHE Dte .im24Pgs(N). BILL/04867/2023-2024 BP-322-23-24 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 16.96 0.00 0 null
11 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC , SM/12377 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II, III and IV (Rep.) under Nalabara W/S Scheme and Pump House No-I and II under Barabankra W/S Scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/001161/2023-2024 4811/EMD 09/08/2023 30 M/S. SAJAHAN CHOWDHURY 78.21 0.00 0 0
Total 1,854.40 781.08 42.12