Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 22,498.23 377.04 1.68  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Special Repairing of DI pipe, Supply of Sluice valve & construction of Sluice valve chamber for Augmentation of Dhanyakuria Water Supply Scheme in Basirhat-II block of North 24 Parganas district under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000080/2024-2025 935/BHTSD 24/05/2024 7 ANKUSH CONSTRUCTION & CO. 0.88 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Special Repairing of existing HDPE & UPVC pipelines for Augmentation of Dhanyakuria Water Supply Scheme in Basirhat-II block of North 24 Parganas district under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000081/2024-2025 936/BHTSD 24/05/2024 7 ANKUSH CONSTRUCTION & CO. 0.98 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Hiring of Diesel Luxury Car is essential for proper supervision of huge number of ground water based Augmentation Scheme at different blocks under Basirhat Sub-Division P.H.E. Dte. (Period 01.07.2024 to 31.12.2024 for Six Month), Sl.No. - 01 Assistant Engineer ORD/000157/2024-2025 1017/BHTSD 28/06/2024 184 OM ENTERPRISE 0.87 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Special repairing of Rising main and pipe lines at Dhanyakuria water supply scheme under Basirhat Sub-Division under Barasat Division PHE Dt Assistant Engineer Junior Engineer ORD/000260/2024-2025 1031/BHTSD 28/06/2024 7 ANKUSH CONSTRUCTION & CO. 0.89 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Dhanyakuria water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000745/2022-2023 3343/BD 16/11/2022 90 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 888.30 373.42 42.04 36
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Hiring additional Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period: 01.07.2023 to 31.12.2023) Assistant Engineer Junior Engineer ORD/002104/2023-2024 605/BHTSD 28/06/2023 184 OM ENTERPRISE 0.87 1.91 219.54 0
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Continuation Work for Hiring additional Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period: 01.01.2024 to 30.06.2024) Assistant Engineer Junior Engineer ORD/002419/2023-2024 1291/BHTSD 29/12/2023 180 OM ENTERPRISE 0.86 1.71 198.84 0
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Material Requisition To Resource Division RTOR000145/2023-2024 4410/BD 10/11/2023 Resource Division 12.32 0.00 0 0
9 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Material Requisition To Resource Division RTOR000172/2022-2023 491/BD 17/02/2023 Resource Division 184.92 0.00 0 0
10 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Material Requisition To Resource Division RTOR000186/2022-2023 608/BD 23/02/2023 Resource Division 40.91 0.00 0 0
11 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
12 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC , SM/12274 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No. II and III (Rep.) under Dhanyakuria W/S Scheme District of 24 Pgs. (N) 2022_PHED_426715_22 (N.I.E.T No. 26 of EE / EMD of 2022-2023) ORD/001877/2023-2024 6726/EMD 28/11/2023 30 S.S.ENTERPRISES 26.67 0.00 0 0
Total 22,498.24 377.04 1.68