Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 1,049.86 158.45 15.09  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC , SM/12124 Augmentation Acceptance cum work order for Arrangement Of Block Level Orientation programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks ( Hasnabad & Hingalganj) in North 24 Parganas under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000171/2024-2025 754/HSD 19/07/2024 10 IMAGIN 0.98 0.49 50 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC , SM/12124 Augmentation Acceptance cum work order for Construction of approach road, North side boundary wall & other allied works at PH no-1 within Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000281/2023-2024 820/HSD 14/07/2023 21 ABDUL ALIM MONDAL. 2.73 2.69 98.53 100
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC , SM/12124 Augmentation Acceptance cum work order for Construction of boundary wall at North side for damaged portion, construction of approach road & other allied works at PH No-2 within Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000282/2023-2024 821/HSD 14/07/2023 10 SARKAR ENTERPRISE 3.87 3.87 100 100
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC , SM/12124 Augmentation Formal work order for "Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 350 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing Functional Household Tap Connection in connection with Augmentaion of Hasnabad water supply scheme, Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000779/2023-2024 2601/BD 28/08/2023 360 M/S S.S.ENTERPRISE. (SOUTH) 793.69 140.79 17.74 25
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC , SM/12124 Augmentation Acceptance cum work order for Providing Functional tap connection at Rameswarpur Union Adarsha Bidyalaya at Rameswarpur in connection with augmentation of Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub- Division P.H.E. Dte. Assistant Engineer ORD/000864/2023-2024 1050/HSD 01/09/2023 10 SARKAR ENTERPRISE 0.60 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC , SM/12124 Augmentation Material Requisition To Resource Division RTOR000240/2022-2023 932/BD 22/03/2023 Resource Division 221.49 0.00 0 0
7 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC , SM/12124 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.III and IV(Rep) under Hasnabad W/S Scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/000078/2023-2024 1972/EMD 07/06/2023 30 GHOSE ENGINEERING SYNDICATE 26.50 10.61 40.04 50
Total 1,049.87 158.44 15.09