Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
11 | 22,366.65 | 87.89 | 0.39 | ||||||||||||||
1 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Regarding Restoration charges for road damages. | BILL/03466/2023-2024 | BP-2023-24-830 | 15/03/2024 | EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE | 13.30 | 0.00 | 0 | 0 | ||||
2 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Regarding Restoration charges for road damages. | BILL/03469/2023-2024 | BP-2023-24-830 | 15/03/2024 | EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE | 8.79 | 0.00 | 0 | 0 | ||||
3 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Gobindapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/000781/2022-2023 | 3488/BD | 02/12/2022 | 90 | M/S NIRMAN CONSTRUCTION. | 341.88 | 15.02 | 4.39 | 99 | |
4 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gobindapur water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. | Assistant Engineer | Junior Engineer | ORD/001007/2022-2023 | 170/BD | 19/01/2023 | 90 | KINGS & CO. | 437.87 | 61.36 | 14.01 | 66 | |
5 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gabindapur Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. | Assistant Engineer | Junior Engineer | ORD/001166/2023-2024 | 2921/BD | 26/09/2023 | 30 | B.M.ENGINEERING. & CONSTRUCTION. | 16.13 | 6.75 | 41.85 | 29 | |
6 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Route Survey, Design Drawing & DPR Preparation for GOBINDAPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | Assistant Engineer | Junior Engineer | ORD/002517/2021-2022 | 443 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.76 | 4.76 | 100 | 1 | |
7 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Material Requisition To Resource Division | RTOR000011/2023-2024 | 1244/BD | 25/04/2023 | Resource Division | 158.92 | 0.00 | 0 | 0 | ||||
8 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Material Requisition To Resource Division | RTOR000065/2023-2024 | 1628/BD | 01/06/2023 | Resource Division | 9.42 | 0.00 | 0 | 0 | ||||
9 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Material Requisition To Resource Division | RTOR000112/2022-2023 | 3699/BD | 14/12/2022 | Resource Division | 26.46 | 0.00 | 0 | 0 | ||||
10 | NORTH 24 PARAGANAS | Barasat Division | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Material Requisition To Resource Division | RTOR000188/2022-2023 | 600/BD | 23/02/2023 | Resource Division | 9.36 | 0.00 | 0 | 0 | ||||
11 | NORTH 24 PARAGANAS | Central Drilling | Augmentation of ground water based piped water supply scheme for Gobindapur to accommodate FHTC , SM/11764 | Augmentation | Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) | Assistant Engineer,Driller In Charge | Junior Engineer | ORD/000001/2023-2024 | 1415/CDD | 21/09/2023 | 300 | JHARGRAM SPV PRIVATE LIMITED | 21,339.76 | 0.00 | 0 | 11 | |
Total | 22,366.65 | 87.89 | 0.39 |