Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 522.42 284.65 54.49  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokulpur to accommodate FHTC , SM/11759 Augmentation Formal work order for Laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) by augmentation for Gokulpur water supply scheme in Swarupnagar block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001245/2022-2023 1039/BD 31/03/2023 90 UTPAL CONSTRUCTION & CO. 411.53 280.33 68.12 70
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokulpur to accommodate FHTC , SM/11759 Augmentation Route Survey, Design Drawing & DPR Preparation for Gokulpur Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002757/2021-2022 448/ BHTSD 23/03/2022 150 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.32 4.32 100 1
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokulpur to accommodate FHTC , SM/11759 Augmentation Material Requisition To Resource Division RTOR000012/2023-2024 1243/BD 25/04/2023 Resource Division 15.85 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gokulpur to accommodate FHTC , SM/11759 Augmentation Material Requisition To Resource Division RTOR000191/2022-2023 605/BD 23/02/2023 Resource Division 20.70 0.00 0 0
5 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Gokulpur to accommodate FHTC , SM/11759 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Replacement) under Daora, Diara & Gokulpur W/S Scheme, District of 24 Pgs. (N). NIET No. 24 of EE/EMD of 2022-23 (Sl. No.- 07) Assistant Engineer Junior Engineer ORD/000828/2022-2023 34/EMD 03/01/2023 30 AHALYA ENGINEERING WORKS 70.02 0.00 0 76
Total 522.42 284.65 54.49