Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 174.53 127.25 72.91  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sonpur to accommodate FHTC , SM/11758 Augmentation Acceptance cum work order for Laying of UPVC Distribution pipe line and providing FHTC for augmentation of Sonepur water Supply Scheme within Swarupnagar Block under Basirhat Sub Division PHE Dte. Assistant Engineer ORD/000438/2024-2025 Sonepur/prema 11/09/2024 25 PREMANANDA ROY BISWAS. 4.64 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sonpur to accommodate FHTC , SM/11758 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Sonpur water supply scheme in Swarupnagar block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000750/2022-2023 3401/BD 21/11/2022 90 M/S ANUBHAB CONSTRUCTION. 133.98 121.26 90.51 95
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sonpur to accommodate FHTC , SM/11758 Augmentation Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Sonepur W/S Scheme including increasing the height of back wash water tank at Swarupnagara Block under Basirhat Sub Division, PHE Dte. Capacity-10.00Cum/hr. Assistant Engineer ORD/002033/2023-2024 924/BD 15/03/2024 60 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 23.32 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sonpur to accommodate FHTC , SM/11758 Augmentation Route Survey, Design Drawing & DPR Preparation for SONPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002497/2021-2022 458 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.87 2.87 100 1
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sonpur to accommodate FHTC , SM/11758 Augmentation Material Requisition To Resource Division RTOR000148/2022-2023 3809/BD 23/12/2022 Resource Division 0.41 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sonpur to accommodate FHTC , SM/11758 Augmentation Material Requisition To Resource Division RTOR000152/2023-2024 4413/BD 10/11/2023 Resource Division 6.16 0.00 0 0
7 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Sonpur to accommodate FHTC , SM/11758 Augmentation Providing voltage correction arrangement with allied works at PH-I of Sonpur GRW W/S Scheme under EMSD-I. ORD/001695/2023-2024 1780EMSD-I 10/08/2023 30 P.K. ENTERPRISE 3.15 3.12 99.05 100
Total 174.53 127.25 72.91