Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 892.2 340.23 38.13  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Chaital to accommodate FHTC , SM/11669 Augmentation Formal work order for construction of 500 cum capacity 20 mtr. staging height R.C.C. Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000792/2023-2024 2614/BD 29/08/2023 365 M/S B.K.ENTERPRISE. 203.43 60.24 29.61 75
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Chaital to accommodate FHTC , SM/11669 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001135/2022-2023 517/BD 20/02/2023 90 M/S B.K.ENTERPRISE. 372.13 279.99 75.24 100
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Chaital to accommodate FHTC , SM/11669 Augmentation Formal work order for Additional Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion in connection with Augmentation of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002054/2023-2024 881/BD 14/03/2024 90 M/S B.K.ENTERPRISE. 140.08 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Chaital to accommodate FHTC , SM/11669 Augmentation Material Requisition To Resource Division RTOR000259/2022-2023 921/BD 22/03/2023 Resource Division 101.89 0.00 0 0
5 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Chaital to accommodate FHTC , SM/11669 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Replacement) under Bharatpur W/S Scheme, Patua W/S Scheme (P/H-I & II) & Chaital W/S Scheme (P/H -I & II) District of 24 Pgs. (N). NIET No. 24 of EE/EMD of 2022-23 (Sl. No.- 04) ORD/000824/2022-2023 31/EMD 03/01/2023 30 M/S P.P. ELECTRICALS 74.67 0.00 0 0
Total 892.22 340.23 38.13