Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 551.18 301.45 54.69  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for augmentation of Ghatpatila (Zone-II) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000036/2023-2024 1354/BD 04/05/2023 90 PATHIK PABAN NANDI 403.71 283.22 70.15 95
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Ghatpatila (Zone-II) water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000767/2023-2024 2688/BD 04/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.13 6.73 41.72 100
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Ghatpatila (Zone-II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001457/2023-2024 4409/BD 10/11/2023 60 ROY CHOWDHURY CONSTRUCTION. 15.27 7.61 49.84 100
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Ghatpatila (Zone-II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. Assistant Engineer ORD/001488/2023-2024 4463/BD 21/11/2023 23 ROY ENGINEERS. 9.57 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Route Survey, Design Drawing & Preparation of DPR for Ghatpatila (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002779/2021-2022 131/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.89 3.89 100 1
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Material Requisition To Resource Division RTOR000093/2023-2024 1861/BD 23/06/2023 Resource Division 15.65 0.00 0 0
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Material Requisition To Resource Division RTOR000156/2022-2023 1257/BD 25/04/2023 Resource Division 64.80 0.00 0 0
8 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Ghatpatila Zone-II to Accommodate FHTC , SM/11666 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I & II (Zone-II) (Replacement) under Ghatpatila W/S Scheme District of 24 Pgs. (N). Assistant Engineer Junior Engineer ORD/001893/2023-2024 6755/EMD 28/11/2023 30 GOENKA ENTERPRISE 22.16 0.00 0 0
Total 551.19 301.46 54.69