Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 22,059.98 155.96 0.71  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sankchura to accommodate FHTC , SM/11653 Augmentation Special repairing of pipe line at different location of Sankhchura Water Supply Scheme under Basirhat Sub Division, P.H.E. Dte. Assistant Engineer ORD/000058/2024-2025 914/BHTSD 24/05/2024 7 SOUMIT CONSTRUCTION 0.31 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sankchura to accommodate FHTC , SM/11653 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Sankchura water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000134/2023-2024 1708/BD 08/06/2023 90 UTPAL CONSTRUCTION & CO. 444.98 155.96 35.05 50
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sankchura to accommodate FHTC , SM/11653 Augmentation Material Requisition To Resource Division RTOR000009/2023-2024 1249/BD 25/04/2023 Resource Division 114.40 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sankchura to accommodate FHTC , SM/11653 Augmentation Material Requisition To Resource Division RTOR000148/2023-2024 4406/BD 10/11/2023 Resource Division 15.40 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sankchura to accommodate FHTC , SM/11653 Augmentation Material Requisition To Resource Division RTOR000185/2023-2024 385/BD 07/02/2024 Resource Division 65.63 0.00 0 0
6 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Sankchura to accommodate FHTC , SM/11653 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
7 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Sankchura to accommodate FHTC , SM/11653 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II and III (Rep.) under Sankchura W/S Scheme and Paschim Madhyampur W/s Scheme District of 24 Pgs. (N) ORD/001165/2023-2024 4815/EMD 09/08/2023 30 CONCORD ENGINEERING 79.50 0.00 0 0
Total 22,059.98 155.96 0.71