Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 422.63 274.49 64.95  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Pipha to accommodate FHTC , SM/11635 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Pipha water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000842/2022-2023 3631/BD 12/12/2022 90 SANDIP BISWAS 318.65 262.69 82.44 95
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Pipha to accommodate FHTC , SM/11635 Augmentation Material Requisition To Resource Division RTOR000137/2023-2024 4423/BD 10/11/2023 Resource Division 6.16 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Pipha to accommodate FHTC , SM/11635 Augmentation Material Requisition To Resource Division RTOR000160/2022-2023 495/BD 17/02/2023 Resource Division 44.41 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Pipha to accommodate FHTC , SM/11635 Augmentation Material Requisition To Resource Division RTOR000181/2022-2023 599/BD 23/02/2023 Resource Division 7.47 0.00 0 0
5 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Pipha to accommodate FHTC , SM/11635 Augmentation : Providing drilling crew and other allied works for construction of Tube Well ( 300mm X200mm X 270 Mtrs. Depth) by utilising Departmental Machineries for Pipha W/S Scheme (TW-I), Barasat-I Block under North 24 Pgs. District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000155/2023-2024 1653/CDD 17/10/2023 30 UNIVERSAL ENTERPRISES 19.87 0.00 0 0
6 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Pipha to accommodate FHTC , SM/11635 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I (Replacement) under Pipha W/S Scheme District of 24 Pgs. (N). (SM/11635) NIET No.- 19 of EE/EMD of 2022-23 (Sl. No.- 15) ORD/000566/2022-2023 6389/EMD 24/11/2022 30 C.M.S. ENGINEERING CONCERN. 13.05 11.80 90.42 0
7 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Pipha to accommodate FHTC , SM/11635 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.III (Replacement) under Pipha W/S Scheme District of 24 Pgs. (N). (SM/11635) NIET No.- 19 of EE/EMD of 2022-23 (Sl. No.- 17) ORD/000570/2022-2023 6391/EMD 24/11/2022 30 SANKAR PROSAD DUTTA & CO. 13.02 0.00 0 0
Total 422.63 274.49 64.95