Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 215.32 46.66 21.67  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gachharati to accommodate FHTC , SM/11541 Augmentation Formal work order for Laying of UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection ) for augmentation of Gachharati water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000670/2022-2023 2934/BD 26/09/2022 90 SANJOY BAKSHI 140.52 44.03 31.33 46
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gachharati to accommodate FHTC , SM/11541 Augmentation Acceptance cum work order for Sinking of 1nos. 300mm. x 200 mm. big dia 270 mtr deep Tube well by Direct Rotary Rig method at Pump House No.-1 using PVC pipe & strainer having 300 mm Dia 36 mtr. long Housing Pipe and 200 mm Dia 30 mtr. long filter for Augmentation of Gachharati Water Supply Scheme in Basirhat - I Block of Basirhat Sub- Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001152/2022-2023 675/BD 01/03/2023 30 DHELA BABA ENTERPRISE 19.62 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gachharati to accommodate FHTC , SM/11541 Augmentation Route Survey, Design Drawing & DPR Preparation for GACHHARATI Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002783/2021-2022 199/ BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.69 2.63 97.77 1
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gachharati to accommodate FHTC , SM/11541 Augmentation Material Requisition To Resource Division RTOR000137/2022-2023 3812/BD 23/12/2022 Resource Division 0.33 0.00 0 0
5 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Gachharati to accommodate FHTC , SM/11541 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Rep.) under Sankarpur and P/H-II under Debhog W/S Scheme with Pump House No-I under Gachharhati W/S Scheme District of 24 Pgs. (N). Assistant Engineer ORD/000026/2024-2025 1483/EMD 03/06/2024 30 EASTERN INDIA SALES & SERVICE 52.16 0.00 0 0
Total 215.33 46.66 21.67