Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 381.66 217.68 57.04  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Malidah Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000774/2022-2023 3471/BD 01/12/2022 90 R.K.MANDAL & CO. 243.90 179.12 73.44 100
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Acceptance cum work order for Sinking of 2 (two) nos. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tube well by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Malidah Water Supply Scheme (H/W Site & 2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001013/2023-2024 2830/BD 15/09/2023 60 DHELA BABA ENTERPRISE 32.28 27.78 86.06 100
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Malidah Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001452/2023-2024 4407/BD 10/11/2023 60 BHABANI ENTERPRISE. 11.49 0.00 0 100
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Malidah Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001486/2023-2024 4465/BD 21/11/2023 23 KAMAL HALDER. 7.15 4.58 64.06 100
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Route Survey, Design Drawing & Preparation of DPR for Malidah Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002785/2021-2022 140/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.74 3.72 99.47 1
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Repairing & Renovation of 02Nos. Pump House and allied works at Malidah water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002970/2021-2022 526/ BON 01/11/2021 21 TAPAN GHOSH. 2.52 2.48 98.41 1
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Material Requisition To Resource Division RTOR000115/2022-2023 3686/BD 14/12/2022 Resource Division 12.95 0.00 0 0
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Material Requisition To Resource Division RTOR000122/2022-2023 3712/BD 15/12/2022 Resource Division 1.79 0.00 0 0
9 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Malidah to accommodate FHTC , SM/11539 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Zone-I) under Ghatpatila W/S Scheme, Kola W/S Scheme (P/H-I &II) & Malidah W/S Scheme (P/H-I & II) District of 24 Pgs. (N). NIET No. 24 of EE/EMD of 2022-23 (Sl. No.- 08) ORD/002530/2023-2024 35EMD 23/08/2023 30 SUNRISE ENGINEERING CORPORATION 65.84 0.00 0 80
Total 381.66 217.68 57.03